{"id":882984,"date":"2015-09-16T12:32:21","date_gmt":"2015-09-16T18:32:21","guid":{"rendered":"https:\/\/www.myconstructionexpert.com\/blog\/?p=882984"},"modified":"2015-09-16T12:32:21","modified_gmt":"2015-09-16T18:32:21","slug":"bid-documents-should-be-clear-or-confusion-ensues","status":"publish","type":"post","link":"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/","title":{"rendered":"Bid Documents should be Clear or Confusion Ensues"},"content":{"rendered":"<p>Advise &amp; Consult, Inc. | September 16, 2015<\/p>\n<p>During the construction bid process there are plenty of plans, numbers and other documents exchanging hands between the property owner and the general contractor and subsequently the subcontractors.\u00a0 Usually the most important number in the bid document is the bottom line cost and sometimes the steps taken to get to that number are pushed aside \u2013 at least until there is a problem.<\/p>\n<p>This was the case recently where the plans that the construction bid was based upon was not clear as the exact size of the width of escalator to be installed.\u00a0 Depending on how you read the plans, it could be interpreted to be either 32 inches or 40 inches wide.\u00a0 The winning subcontractor submitted a bid for the 32 inch escalators and then proceeded to install the 32 inch escalators.\u00a0 The property owner wanted the 40 inch wide escalators installed, but, the court determined that the plan scale was off 3 to 3 \u00bd inches.\u00a0 The contractor made reference to various tick marks and dots on the plans, but to no avail.\u00a0 The plans were ambiguous and that the escalator installer was well justified in submitting a bid for 32 inches.\u00a0 The subcontractor and the general contractor could not agree as to who should pay to replace the escalators.\u00a0 The subcontractor sued to receive payment for the 40 inch escalator and the general contractor sued the subcontractor for all concessions they had to pay to the owner.<\/p>\n<p>The court made significant note that both the contractor and the architect approved the bid from the subcontractor in what was, at this point, a clearly noted 32 inch step.\u00a0 Based on this, the subcontractor was not held in breach of contract and was entitled to be paid for the work to install the 40 inch escalator.<\/p>\n<p>As is often the case in situations like this, the case went to appeal. The Court of Appeals reversed the trial court.\u00a0 It ruled that because the subcontractor was aware of the ambiguity on the plans and should have made this known.\u00a0 The subcontractor\u2019s estimator testified that he noticed that the plans were not specific when he prepared the bid and there is no record of him asking for clarification of the plans.\u00a0 Because the estimator failed to get clarification, this means that he took the risk that the general contractor would have a different and reasonable interpretation of the plans.<\/p>\n<p>So, we have learned that estimators should be questioning these confusing bid documents\u00a0with those upstream contractors and to document these discussions so that, even years later, everyone will have a clear idea what was discussed.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Advise &amp; Consult, Inc. | September 16, 2015 During the construction bid process there are plenty of plans, numbers and other documents exchanging hands between the property owner and the general contractor and subsequently the subcontractors.\u00a0 Usually the most important number in the bid document is the bottom line cost and sometimes the steps taken&hellip; <a class=\"more-link\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/\">Continue reading <span class=\"screen-reader-text\">Bid Documents should be Clear or Confusion Ensues<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[14,4,164],"tags":[8816,164],"class_list":["post-882984","post","type-post","status-publish","format-standard","hentry","category-construction-2","category-construction-defects","category-construction-dispute","tag-construction-bid","tag-construction-dispute","entry"],"jetpack_publicize_connections":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Bid Documents should be Clear or Confusion Ensues - Advise &amp; Consult, Inc.<\/title>\n<meta name=\"description\" content=\"bid documents should be clear so that the estimators, subcontractors and all that work on the project have a clear idea of what to bid and expect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bid Documents should be Clear or Confusion Ensues - Advise &amp; Consult, Inc.\" \/>\n<meta property=\"og:description\" content=\"bid documents should be clear so that the estimators, subcontractors and all that work on the project have a clear idea of what to bid and expect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/\" \/>\n<meta property=\"og:site_name\" content=\"Advise &amp; Consult, Inc.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\" \/>\n<meta property=\"article:published_time\" content=\"2015-09-16T18:32:21+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:site\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\"},\"headline\":\"Bid Documents should be Clear or Confusion Ensues\",\"datePublished\":\"2015-09-16T18:32:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/\"},\"wordCount\":436,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"keywords\":[\"construction bid\",\"Construction Dispute\"],\"articleSection\":[\"Construction\",\"Construction Defects\",\"Construction Dispute\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/\",\"name\":\"Bid Documents should be Clear or Confusion Ensues - Advise &amp; Consult, Inc.\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\"},\"datePublished\":\"2015-09-16T18:32:21+00:00\",\"description\":\"bid documents should be clear so that the estimators, subcontractors and all that work on the project have a clear idea of what to bid and expect.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"name\":\"Advise &amp; Consult, Inc.\",\"description\":\"Construction Expert Witnesses\",\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\",\"name\":\"Advise & Consult\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"contentUrl\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"width\":162,\"height\":75,\"caption\":\"Advise & Consult\"},\"image\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\",\"https:\/\/x.com\/adviseconsult\",\"https:\/\/www.linkedin.com\/company-beta\/204526\/\",\"https:\/\/www.youtube.com\/user\/MrConstructionExpert\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/www.expertwitnessinconstruction.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bid Documents should be Clear or Confusion Ensues - Advise &amp; Consult, Inc.","description":"bid documents should be clear so that the estimators, subcontractors and all that work on the project have a clear idea of what to bid and expect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/","og_locale":"en_US","og_type":"article","og_title":"Bid Documents should be Clear or Confusion Ensues - Advise &amp; Consult, Inc.","og_description":"bid documents should be clear so that the estimators, subcontractors and all that work on the project have a clear idea of what to bid and expect.","og_url":"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/","og_site_name":"Advise &amp; Consult, Inc.","article_publisher":"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","article_published_time":"2015-09-16T18:32:21+00:00","author":"admin","twitter_card":"summary_large_image","twitter_creator":"@adviseconsult","twitter_site":"@adviseconsult","twitter_misc":{"Written by":"admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/#article","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/"},"author":{"name":"admin","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7"},"headline":"Bid Documents should be Clear or Confusion Ensues","datePublished":"2015-09-16T18:32:21+00:00","mainEntityOfPage":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/"},"wordCount":436,"commentCount":0,"publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"keywords":["construction bid","Construction Dispute"],"articleSection":["Construction","Construction Defects","Construction Dispute"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/","name":"Bid Documents should be Clear or Confusion Ensues - Advise &amp; Consult, Inc.","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website"},"datePublished":"2015-09-16T18:32:21+00:00","description":"bid documents should be clear so that the estimators, subcontractors and all that work on the project have a clear idea of what to bid and expect.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.myconstructionexpert.com\/blog\/bid-documents-should-be-clear-or-confusion-ensues\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website","url":"https:\/\/www.myconstructionexpert.com\/blog\/","name":"Advise &amp; Consult, Inc.","description":"Construction Expert Witnesses","publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization","name":"Advise & Consult","url":"https:\/\/www.myconstructionexpert.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","contentUrl":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","width":162,"height":75,"caption":"Advise & Consult"},"image":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","https:\/\/x.com\/adviseconsult","https:\/\/www.linkedin.com\/company-beta\/204526\/","https:\/\/www.youtube.com\/user\/MrConstructionExpert"]},{"@type":"Person","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","caption":"admin"},"sameAs":["http:\/\/www.expertwitnessinconstruction.com"]}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2ztG6-3HHG","jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/882984","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/comments?post=882984"}],"version-history":[{"count":1,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/882984\/revisions"}],"predecessor-version":[{"id":882985,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/882984\/revisions\/882985"}],"wp:attachment":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/media?parent=882984"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/categories?post=882984"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/tags?post=882984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}