{"id":893539,"date":"2018-01-31T13:29:00","date_gmt":"2018-01-31T20:29:00","guid":{"rendered":"https:\/\/www.myconstructionexpert.com\/blog\/?p=893539"},"modified":"2018-01-31T13:29:00","modified_gmt":"2018-01-31T20:29:00","slug":"kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor","status":"publish","type":"post","link":"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/","title":{"rendered":"Kentucky Supreme Court Holds \u201cPay-if-Paid\u201d Provision in Subcontract Is Valid and Enforceable, Shifting Risk to Subcontractor"},"content":{"rendered":"<p>Michelle Beth Rosenberg | <a href=\"https:\/\/www.lexology.com\/library\/detail.aspx?g=b07c7c01-f7ec-47ce-aee7-47418bd804e2\" target=\"_blank\">Pepper Hamilton LLP<\/a> | January 25, 2018<\/p>\n<p><strong><em>Superior Steel, Inv. v. Ascent at Roebling\u2019s Bridge, LLC, 2017 Ky. LEXIS 511 (December 14, 2017)<\/em><\/strong><\/p>\n<p>Corporex Development and Construction Management, LLC (\u201cCorporex\u201d), a design builder, contracted with Dugan &amp; Meyers Construction Company (\u201cD&amp;M\u201d), a construction manager and general contractor on the Ascent at Roebling\u2019s Bridge (the \u201cProject\u201d), a 21-floor luxury condominium in Covington, Kentucky.<\/p>\n<p>As a cost saving measure, D&amp;M asked Superior Steel, Inc. (\u201cSuperior\u201d) to fabricate the steel and to have Ben Hur Construction Company (\u201cBen Hur\u201d) complete the erection and installation work. Superior and D&amp;M entered into a fixed price contract for $1,814,000. In turn, Superior subcontracted with Ben Hur to erect the steel and metal decking for $444,000. As structured, the payments would flow from Corporex to D&amp;M to Superior. Superior would then pay Ben Hur.<\/p>\n<p>During the course of the Project, D&amp;M instructed both Superior and Ben Hur to perform extra work. Ben Hur and Superior submitted work orders to D&amp;M who in turn submitted work orders to Corporex. Ultimately, Corporex refused to pay for Superior and Ben Hur\u2019s additional work and refused to pay Superior\u2019s retainage.<\/p>\n<p>Superior and Ben Hur filed a complaint against Corporex and D&amp;M for breach of contract, among other claims, in order to recover monies owed. The trial court held that a contract existed between Superior and D&amp;M and that an implied contract existed between Ben Hur and D&amp;M, as a matter of law. The trial court entered judgment in favor of Superior for $124,017.26 for extra work performed and $195,143.40 for unpaid retainage. Additionally, the trial court entered judgment in favor of Ben Hur for $284,295.53 for extra work performed.<\/p>\n<p>The Court of Appeals vacated the trial court judgment, reasoning that the jury should have been explicitly instructed as to the \u201cpay-if-paid\u201d provisions in the Superior\/D&amp;M contract. Such provisions essentially mandated that Superior was entitled to payment from D&amp;M only if D&amp;M received payment from Corporex. The Kentucky Supreme Court agreed with the Court of Appeals on this issue.<\/p>\n<p>At the center of Superior and Ben Hur\u2019s breach of contract claims, was the \u201cpay-if-paid\u201d provisions which condition D&amp;M\u2019s payment of Superior on D&amp;M having first been paid by Corporex. \u201cPay-if-paid\u201d conditions shift the risk of nonpayment from the contractor to the subcontractor. The Superior\/D&amp;M contract contains two sections with pay-if-paid language. First, Article 7.11 \u201cClaims Payment,\u201d states:<\/p>\n<p>[n]o additional compensation shall be paid by the Contractor to the Subcontractor for any claim arising out of the performance of this Subcontract, unless the Contractor has collected corresponding additional compensation from the owner, or other party involved, or unless by written agreement from the Contractor to the Subcontractor prior to the execution of the Work performed under said claim, which agreement and work order must be signed by an officer of the Contractor.<\/p>\n<p>Second, Article 8.2.4, \u201cTime of Payment\u201d states:<\/p>\n<p>[r]eceipt of payment by the Contractor from the Owner for the Subcontractor Work is a condition precedent to payment by the Contractor to Subcontractor. The subcontractor hereby acknowledges that it relied on the credit of the Owner, not the Contractor for payment of the Subcontract Work.<\/p>\n<p>The Supreme Court held that these provisions unambiguously created a condition precedent that D&amp;M must receive payment prior to its obligation to pay Superior. Therefore, the provisions unequivocally allocated the risk of nonpayment by Corporex to Superior and relieved D&amp;M of its obligation to pay Superior unless and until it received payment from Corporex. As it was undisputed that Corporex never paid D&amp;M, D&amp;M was not obligated to pay Superior under the contract terms. The Supreme Court held the \u201cpay-if-paid\u201d provisions were consistent with public policy because Kentucky has long respected freedom of contract and allowed the parties to allocate foreseeable risk among themselves. Furthermore, the Supreme Court refused to invalidate such a policy without clear direction from the Legislature.<\/p>\n<p>Thus, because the Supreme Court held that the \u201cpay-if-paid\u201d provisions were valid and enforceable, those provisions precluded judgment in favor of Superior against D&amp;M. Nevertheless, the Supreme Court also held that Superior and Ben Hur, which had obtained a judgment for unjust enrichment against Corporex for the extra work claims, could sustain that judgment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Michelle Beth Rosenberg | Pepper Hamilton LLP | January 25, 2018 Superior Steel, Inv. v. Ascent at Roebling\u2019s Bridge, LLC, 2017 Ky. LEXIS 511 (December 14, 2017) Corporex Development and Construction Management, LLC (\u201cCorporex\u201d), a design builder, contracted with Dugan &amp; Meyers Construction Company (\u201cD&amp;M\u201d), a construction manager and general contractor on the Ascent at&hellip; <a class=\"more-link\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/\">Continue reading <span class=\"screen-reader-text\">Kentucky Supreme Court Holds \u201cPay-if-Paid\u201d Provision in Subcontract Is Valid and Enforceable, Shifting Risk to Subcontractor<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[9],"tags":[9895,72,7776,10339,157],"class_list":["post-893539","post","type-post","status-publish","format-standard","hentry","category-construction-contracts","tag-advise-consult","tag-construction-contracts-2","tag-kentucky","tag-pay-if-paid-provision","tag-subcontractor","entry"],"jetpack_publicize_connections":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Kentucky Supreme Court Holds \u201cPay-if-Paid\u201d Provision in Subcontract Is Valid and Enforceable, Shifting Risk to Subcontractor - Advise &amp; Consult, Inc.<\/title>\n<meta name=\"description\" content=\"because the Supreme Court held that the \u201cpay-if-paid\u201d provision as valid and enforceable, those provisions precluded judgment\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kentucky Supreme Court Holds \u201cPay-if-Paid\u201d Provision in Subcontract Is Valid and Enforceable, Shifting Risk to Subcontractor - Advise &amp; Consult, Inc.\" \/>\n<meta property=\"og:description\" content=\"because the Supreme Court held that the \u201cpay-if-paid\u201d provision as valid and enforceable, those provisions precluded judgment\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/\" \/>\n<meta property=\"og:site_name\" content=\"Advise &amp; Consult, Inc.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-01-31T20:29:00+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:site\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\"},\"headline\":\"Kentucky Supreme Court Holds \u201cPay-if-Paid\u201d Provision in Subcontract Is Valid and Enforceable, Shifting Risk to Subcontractor\",\"datePublished\":\"2018-01-31T20:29:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/\"},\"wordCount\":751,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"keywords\":[\"Advise &amp; Consult\",\"construction contracts\",\"Kentucky\",\"Pay if Paid Provision\",\"Subcontractor\"],\"articleSection\":[\"Construction Contracts\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/\",\"name\":\"Kentucky Supreme Court Holds \u201cPay-if-Paid\u201d Provision in Subcontract Is Valid and Enforceable, Shifting Risk to Subcontractor - Advise &amp; Consult, Inc.\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\"},\"datePublished\":\"2018-01-31T20:29:00+00:00\",\"description\":\"because the Supreme Court held that the \u201cpay-if-paid\u201d provision as valid and enforceable, those provisions precluded judgment\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"name\":\"Advise &amp; Consult, Inc.\",\"description\":\"Construction Expert Witnesses\",\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\",\"name\":\"Advise & Consult\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"contentUrl\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"width\":162,\"height\":75,\"caption\":\"Advise & Consult\"},\"image\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\",\"https:\/\/x.com\/adviseconsult\",\"https:\/\/www.linkedin.com\/company-beta\/204526\/\",\"https:\/\/www.youtube.com\/user\/MrConstructionExpert\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/www.expertwitnessinconstruction.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Kentucky Supreme Court Holds \u201cPay-if-Paid\u201d Provision in Subcontract Is Valid and Enforceable, Shifting Risk to Subcontractor - Advise &amp; Consult, Inc.","description":"because the Supreme Court held that the \u201cpay-if-paid\u201d provision as valid and enforceable, those provisions precluded judgment","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/","og_locale":"en_US","og_type":"article","og_title":"Kentucky Supreme Court Holds \u201cPay-if-Paid\u201d Provision in Subcontract Is Valid and Enforceable, Shifting Risk to Subcontractor - Advise &amp; Consult, Inc.","og_description":"because the Supreme Court held that the \u201cpay-if-paid\u201d provision as valid and enforceable, those provisions precluded judgment","og_url":"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/","og_site_name":"Advise &amp; Consult, Inc.","article_publisher":"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","article_published_time":"2018-01-31T20:29:00+00:00","author":"admin","twitter_card":"summary_large_image","twitter_creator":"@adviseconsult","twitter_site":"@adviseconsult","twitter_misc":{"Written by":"admin","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/#article","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/"},"author":{"name":"admin","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7"},"headline":"Kentucky Supreme Court Holds \u201cPay-if-Paid\u201d Provision in Subcontract Is Valid and Enforceable, Shifting Risk to Subcontractor","datePublished":"2018-01-31T20:29:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/"},"wordCount":751,"commentCount":0,"publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"keywords":["Advise &amp; Consult","construction contracts","Kentucky","Pay if Paid Provision","Subcontractor"],"articleSection":["Construction Contracts"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/","name":"Kentucky Supreme Court Holds \u201cPay-if-Paid\u201d Provision in Subcontract Is Valid and Enforceable, Shifting Risk to Subcontractor - Advise &amp; Consult, Inc.","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website"},"datePublished":"2018-01-31T20:29:00+00:00","description":"because the Supreme Court held that the \u201cpay-if-paid\u201d provision as valid and enforceable, those provisions precluded judgment","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.myconstructionexpert.com\/blog\/kentucky-supreme-court-holds-pay-paid-provision-subcontract-valid-enforceable-shifting-risk-subcontractor\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website","url":"https:\/\/www.myconstructionexpert.com\/blog\/","name":"Advise &amp; Consult, Inc.","description":"Construction Expert Witnesses","publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization","name":"Advise & Consult","url":"https:\/\/www.myconstructionexpert.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","contentUrl":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","width":162,"height":75,"caption":"Advise & Consult"},"image":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","https:\/\/x.com\/adviseconsult","https:\/\/www.linkedin.com\/company-beta\/204526\/","https:\/\/www.youtube.com\/user\/MrConstructionExpert"]},{"@type":"Person","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","caption":"admin"},"sameAs":["http:\/\/www.expertwitnessinconstruction.com"]}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2ztG6-3KrV","jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/893539","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/comments?post=893539"}],"version-history":[{"count":1,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/893539\/revisions"}],"predecessor-version":[{"id":893540,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/893539\/revisions\/893540"}],"wp:attachment":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/media?parent=893539"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/categories?post=893539"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/tags?post=893539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}