{"id":894555,"date":"2018-07-18T10:19:58","date_gmt":"2018-07-18T16:19:58","guid":{"rendered":"https:\/\/www.myconstructionexpert.com\/blog\/?p=894555"},"modified":"2018-07-18T10:19:58","modified_gmt":"2018-07-18T16:19:58","slug":"sometimes-get-away-unwritten-contracts","status":"publish","type":"post","link":"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/","title":{"rendered":"Sometimes You Get Away with Unwritten Contracts. . ."},"content":{"rendered":"<p>Christopher G. Hill | Construction Law Musings | July 10, 2018<\/p>\n<p>I have spoken often regarding the need for a\u00a0well written construction contract\u00a0that sets out the \u201cterms of engagement\u201d for your construction project. A written construction contract\u00a0sets expectations\u00a0and allows the parties to the\u00a0contract to determine the \u201claw\u201d of their project. An unwritten \u201cgentleman\u2019s agreement\u201d can lead to confusion, faulty memories, and more\u00a0money paid to construction counsel\u00a0than you would like as we lawyers play around in the grey areas.<span id=\"more-13103\"><\/span><\/p>\n<p>One other area where the written versus unwritten distinction makes a difference is in the calculation of the statute of limitations. In Virginia, a 5 year statute of limitations applies to written contracts while a 3 year statute of limitations applies to unwritten contracts. This distinction came into stark relief in the case of\u00a0M&amp;C Hauling &amp; Constr. Inc. v. Wilbur Hale\u00a0in the Fairfax, Virginia Circuit Court. In M&amp;C Hauling, M&amp;C provided hauling services to the defendant through a subcontract with Hauling Unlimited in 2014, the last of which was in July. M&amp;C provided over 2000 hours of hauling and provided time tickets (that were passed to Mr. Hale on Hauling Unlimited letterhead and signed by Mr. Hale or his agent) and an invoice stating the price term of $75.00 per hour. No separate written contract between M&amp;C and Hauling Unlimited or Mr. Hale existed.<\/p>\n<p>In February of 2018, beyond the 3 year statute of limitations for unwritten contracts but prior to the expiration of the 5 year limitation period for written contracts. Needless to say, Hauling Unlimited filed a plea in bar to have the matter dismissed as being brought beyond the 3 year statute and argued that no signed or other written contract existed, therefore the 3 year limitation period applied. After review of the various precedents (which I commend for your reading), the Court determined that where a signature on a contract is not a condition of the contract itself being a written one. In doing so, the Court stated<\/p>\n<blockquote><p>In the immediate facts, although there was no signature by Defendant Hauling Unlimited, the parties did not make their signatures a condition of the contract being a written one. All the terms of the agreement between the Plaintiff and Defendant, including the rate and the hours worked, were committed to writing in the daily sales tickets and the invoice. These terms were unconditionally assented to by the parties.<\/p><\/blockquote>\n<p>In short, the Court determined that Hauling Unlimited and Mr. Hale assented to M&amp;C\u2019s terms and did not insist on a signature to make their contract a written one.<\/p>\n<p>The lesson from this? At the very least be sure to provide consistent documentation of your work if you aren\u2019t going to have a written contract. The better lesson? Don\u2019t put yourself in this position. Call your friendly\u00a0experienced construction attorney\u00a0and get a written contract together that both keeps arguments such as these from looking like good ones and also extends your statute of limitations.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Christopher G. Hill | Construction Law Musings | July 10, 2018 I have spoken often regarding the need for a\u00a0well written construction contract\u00a0that sets out the \u201cterms of engagement\u201d for your construction project. A written construction contract\u00a0sets expectations\u00a0and allows the parties to the\u00a0contract to determine the \u201claw\u201d of their project. An unwritten \u201cgentleman\u2019s agreement\u201d can&hellip; <a class=\"more-link\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/\">Continue reading <span class=\"screen-reader-text\">Sometimes You Get Away with Unwritten Contracts. . .<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[9],"tags":[9895,72,187],"class_list":["post-894555","post","type-post","status-publish","format-standard","hentry","category-construction-contracts","tag-advise-consult","tag-construction-contracts-2","tag-statute-of-limitations","entry"],"jetpack_publicize_connections":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Sometimes You Get Away with Unwritten Contracts. . . - Advise &amp; Consult, Inc.<\/title>\n<meta name=\"description\" content=\"A written construction contract\u00a0sets expectations\u00a0and allows the parties to the\u00a0contract to determine the \u201claw\u201d of their project\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sometimes You Get Away with Unwritten Contracts. . . - Advise &amp; Consult, Inc.\" \/>\n<meta property=\"og:description\" content=\"A written construction contract\u00a0sets expectations\u00a0and allows the parties to the\u00a0contract to determine the \u201claw\u201d of their project\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/\" \/>\n<meta property=\"og:site_name\" content=\"Advise &amp; Consult, Inc.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-07-18T16:19:58+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:site\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\"},\"headline\":\"Sometimes You Get Away with Unwritten Contracts. . .\",\"datePublished\":\"2018-07-18T16:19:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/\"},\"wordCount\":511,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"keywords\":[\"Advise &amp; Consult\",\"construction contracts\",\"Statute of Limitations\"],\"articleSection\":[\"Construction Contracts\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/\",\"name\":\"Sometimes You Get Away with Unwritten Contracts. . . - Advise &amp; Consult, Inc.\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\"},\"datePublished\":\"2018-07-18T16:19:58+00:00\",\"description\":\"A written construction contract\u00a0sets expectations\u00a0and allows the parties to the\u00a0contract to determine the \u201claw\u201d of their project\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"name\":\"Advise &amp; Consult, Inc.\",\"description\":\"Construction Expert Witnesses\",\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\",\"name\":\"Advise & Consult\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"contentUrl\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"width\":162,\"height\":75,\"caption\":\"Advise & Consult\"},\"image\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\",\"https:\/\/x.com\/adviseconsult\",\"https:\/\/www.linkedin.com\/company-beta\/204526\/\",\"https:\/\/www.youtube.com\/user\/MrConstructionExpert\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/www.expertwitnessinconstruction.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sometimes You Get Away with Unwritten Contracts. . . - Advise &amp; Consult, Inc.","description":"A written construction contract\u00a0sets expectations\u00a0and allows the parties to the\u00a0contract to determine the \u201claw\u201d of their project","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/","og_locale":"en_US","og_type":"article","og_title":"Sometimes You Get Away with Unwritten Contracts. . . - Advise &amp; Consult, Inc.","og_description":"A written construction contract\u00a0sets expectations\u00a0and allows the parties to the\u00a0contract to determine the \u201claw\u201d of their project","og_url":"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/","og_site_name":"Advise &amp; Consult, Inc.","article_publisher":"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","article_published_time":"2018-07-18T16:19:58+00:00","author":"admin","twitter_card":"summary_large_image","twitter_creator":"@adviseconsult","twitter_site":"@adviseconsult","twitter_misc":{"Written by":"admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/#article","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/"},"author":{"name":"admin","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7"},"headline":"Sometimes You Get Away with Unwritten Contracts. . .","datePublished":"2018-07-18T16:19:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/"},"wordCount":511,"commentCount":0,"publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"keywords":["Advise &amp; Consult","construction contracts","Statute of Limitations"],"articleSection":["Construction Contracts"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/","name":"Sometimes You Get Away with Unwritten Contracts. . . - Advise &amp; Consult, Inc.","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website"},"datePublished":"2018-07-18T16:19:58+00:00","description":"A written construction contract\u00a0sets expectations\u00a0and allows the parties to the\u00a0contract to determine the \u201claw\u201d of their project","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.myconstructionexpert.com\/blog\/sometimes-get-away-unwritten-contracts\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website","url":"https:\/\/www.myconstructionexpert.com\/blog\/","name":"Advise &amp; Consult, Inc.","description":"Construction Expert Witnesses","publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization","name":"Advise & Consult","url":"https:\/\/www.myconstructionexpert.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","contentUrl":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","width":162,"height":75,"caption":"Advise & Consult"},"image":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","https:\/\/x.com\/adviseconsult","https:\/\/www.linkedin.com\/company-beta\/204526\/","https:\/\/www.youtube.com\/user\/MrConstructionExpert"]},{"@type":"Person","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","caption":"admin"},"sameAs":["http:\/\/www.expertwitnessinconstruction.com"]}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2ztG6-3KIj","jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/894555","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/comments?post=894555"}],"version-history":[{"count":1,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/894555\/revisions"}],"predecessor-version":[{"id":894556,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/894555\/revisions\/894556"}],"wp:attachment":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/media?parent=894555"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/categories?post=894555"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/tags?post=894555"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}