{"id":895733,"date":"2019-04-12T08:55:36","date_gmt":"2019-04-12T14:55:36","guid":{"rendered":"https:\/\/www.myconstructionexpert.com\/blog\/?p=895733"},"modified":"2019-04-11T15:07:58","modified_gmt":"2019-04-11T21:07:58","slug":"when-do-defects-prevent-practical-completion","status":"publish","type":"post","link":"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/","title":{"rendered":"When Do Defects Prevent Practical Completion?"},"content":{"rendered":"\n<p>Julian Bailey, Emma Knight and Helena Payne | <a href=\"https:\/\/www.whitecase.com\/publications\/alert\/when-do-defects-prevent-practical-completion?s=when%20do%20defects%20prevent%20practical%20completion?\">White &amp; Case<\/a> | April 4, 2019  <\/p>\n\n\n\n<p><strong>Practical&nbsp;completion represents the physical completion of works on construction projects. Despite its importance, it is not a legal term of art, and whether or not&nbsp;practical&nbsp;completion has been achieved requires determination on a case-by-case basis.<\/strong><\/p>\n\n\n\n<p><strong>The recent judgment in\u00a0<em>Mears Ltd v Costplan Services (S.E.) Ltd<\/em>\u00a0[2019] EWCA Civ 502 provides an important analysis of the interplay between patent\u00a0defects and\u00a0practical\u00a0completion. In this case, the Court of Appeal confirmed that a material defect does not necessarily\u00a0prevent\u00a0practical\u00a0completion from being achieved.<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Key facts<\/h3>\n\n\n\n<p>In&nbsp;<em>Mears v Costplan<\/em>, the Court of Appeal considered the meaning of &#8216;practical&nbsp;completion&#8217; in the context of the construction of student accommodation and a related agreement for lease.<\/p>\n\n\n\n<p>PNSL, the employer, contracted with Pickstock, the contractor, for the design and build of student accommodation. Separately, Mears, the tenant, entered into an agreement for lease (&#8220;<strong>AFL<\/strong>&#8220;) with PNSL and Pickstock to take a long lease of the property following completion.<\/p>\n\n\n\n<p>The AFL contained a longstop provision that permitted the tenant to terminate the AFL if the&nbsp;practical&nbsp;completion certificate had not been issued by the longstop date.<\/p>\n\n\n\n<p>Further, the AFL prohibited variations to the works that materially affected the size of the accommodation rooms. It considered a reduction in size by more than 3% from the relevant drawings as material. In the event, of the intended 348 bedrooms plus kitchens and certain other rooms, 56 rooms were built more than 3% smaller than the relevant drawings. These breaches were irremediable: there was no prospect of the building being torn down and re-built.<\/p>\n\n\n\n<p>The tenant alleged that any breach of the 3% tolerance was a material and substantial breach of the AFL, meaning that (i) it was entitled to terminate the AFL and (ii)&nbsp;practical&nbsp;completion could not be certified. At first instance, the judge ruled in favour of the employer \/ landlord, noting that it would be &#8216;commercially absurd&#8217; if the breach of the 3% tolerance made&nbsp;practical&nbsp;completion impossible and allowed the tenant to terminate the AFL and walk away.<\/p>\n\n\n\n<p>The tenant&#8217;s appeal was dismissed by the Court of Appeal, which held that:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>The failure to meet the 3% tolerance was a breach of contract, but not automatically a&nbsp;<em>material<\/em>&nbsp;breach of contract allowing the tenant to terminate. The question of materiality related to room size and not to the resulting breach of contract. If the parties were to be taken to have agreed that any failure (no matter how trivial) to meet the 3% tolerance amounted to a material breach of contract, it would lead to a very uncommercial result.<\/li><li>Practical&nbsp;completion is a question for the certifier. Whether a derogation \/ breach is so material as to preclude&nbsp;practical&nbsp;completion is a matter of fact and degree in each case. Patent&nbsp;defects&nbsp;regarded as &#8216;trifling&#8217; cannot&nbsp;prevent&nbsp;the certification of&nbsp;practical&nbsp;completion, whether the defect is capable of economic remedy or not. Whether the 3% tolerance breach was trifling was not a matter for the court here. The issue of economic remedy goes to the proper measure of loss, and not to the issue of&nbsp;practical&nbsp;completion.<\/li><\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">The meaning of &#8216;practical&nbsp;completion&#8217;<\/h3>\n\n\n\n<p>The Court of Appeal reviewed the current state of the law on&nbsp;practical&nbsp;completion, making the following observations:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Practical&nbsp;completion is easier to recognise than define, and there are no hard and fast rules as to&nbsp;when&nbsp;practical&nbsp;completion is (or is not) achieved;<\/li><li>The existence of latent (i.e. unknown)&nbsp;defects&nbsp;cannot&nbsp;prevent&nbsp;practical&nbsp;completion (as they are unknown to the certifier);<\/li><li>In relation to patent (i.e. known)&nbsp;defects, there is no difference between uncompleted items of work and an item of defective work that requires to be remedied;<\/li><li>Some authorities suggest the existence of patent&nbsp;defects&nbsp;prevents&nbsp;practical&nbsp;completion, however the preferred view (which has been adopted in almost all cases) is that the existence of &#8216;trifling&#8217; patent&nbsp;defects&nbsp;does not preclude&nbsp;practical&nbsp;completion;<\/li><li>Whether an item is &#8216;trifling&#8217; is a matter of fact and degree to be measured against the intended purpose of the works; and<\/li><li>The mere fact that a defect is irremediable does not mean that works are not practically complete.<\/li><\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Comment<\/h3>\n\n\n\n<p>The achievement of&nbsp;practical&nbsp;completion is primarily a question of fact and judgment, which is to be determined having regard to what the contractor promised to supply, the definition (if any) of &#8220;practical&nbsp;completion&#8221; in the relevant contract, and whether what the contractor has supplied substantially corresponds with what the contract required so as to constitute &#8220;practical&nbsp;completion&#8221;. The intents and purposes of the project will be important to consider&nbsp;when&nbsp;addressing the question of whether&nbsp;practical&nbsp;completion has been achieved.<\/p>\n\n\n\n<p>However, the Court of Appeal made clear that, in this particular case, the mere fact that the accommodation was habitable did not mean the works were practically complete. It is a question of whether any patent&nbsp;defects&nbsp;could accurately be described as trifling. If parties intend for&nbsp;practical&nbsp;completion to be dependent on certain aspects of the work being completed in accordance with the letter of the contract, they should draft carefully for this.<\/p>\n\n\n\n<p>In contrast, a more precise approach to completion is often taken in contracts for mechanical plant or similar facilities, such as power stations. On these projects, &#8216;completion&#8217; is only taken to occur if, amongst other things, certain testing and commissioning is completed satisfactorily, based on defined benchmarks. Liquidated damages may also be payable if the plant does not function according to a performance specification. Furthermore, completion may also be dependent upon the provision of &#8220;as built&#8221; documents, operation and maintenance manuals and other documents.<\/p>\n\n\n\n<p>Exactly&nbsp;when&nbsp;practical&nbsp;completion will have occurred is dependent on the nature of the asset, its intended purpose and any relevant contractual provisions. Certainty on exactly&nbsp;when&nbsp;completion is achieved is important given its consequences: the commencement of the&nbsp;defects&nbsp;liability period, the potential end of liquidated damages, the possible impact on retention monies, and the movement of risk to the Employer, to name a few.<\/p>\n\n\n\n<p><em>Mears v Costplan<\/em>&nbsp;helpfully clarifies the approach that the English courts will take to determining controversies over the achievement of&nbsp;practical&nbsp;completion. But ultimately, if the contractual criteria for &#8216;practical&nbsp;completion&#8217; are defined in only general terms, what this will mean is that disputes over the achievement of&nbsp;practicalcompletion will continue to arise in practice.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Julian Bailey, Emma Knight and Helena Payne | White &amp; Case | April 4, 2019 Practical&nbsp;completion represents the physical completion of works on construction projects. Despite its importance, it is not a legal term of art, and whether or not&nbsp;practical&nbsp;completion has been achieved requires determination on a case-by-case basis. The recent judgment in\u00a0Mears Ltd v&hellip; <a class=\"more-link\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/\">Continue reading <span class=\"screen-reader-text\">When Do Defects Prevent Practical Completion?<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[14,4],"tags":[9895,12,10247,447,10776],"class_list":["post-895733","post","type-post","status-publish","format-standard","hentry","category-construction-2","category-construction-defects","tag-advise-consult","tag-construction","tag-construction-defect-disputes","tag-patent-construction-defects","tag-practical-completion","entry"],"jetpack_publicize_connections":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>When Do Defects Prevent Practical Completion? - Advise &amp; Consult, Inc.<\/title>\n<meta name=\"description\" content=\"Mears Ltd v Costplan Services (S.E.) Ltd [2019] EWCA Civ 502 provides an important analysis of the interplay between patent defects and practical completion\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"When Do Defects Prevent Practical Completion? - Advise &amp; Consult, Inc.\" \/>\n<meta property=\"og:description\" content=\"Mears Ltd v Costplan Services (S.E.) Ltd [2019] EWCA Civ 502 provides an important analysis of the interplay between patent defects and practical completion\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/\" \/>\n<meta property=\"og:site_name\" content=\"Advise &amp; Consult, Inc.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-04-12T14:55:36+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:site\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\"},\"headline\":\"When Do Defects Prevent Practical Completion?\",\"datePublished\":\"2019-04-12T14:55:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/\"},\"wordCount\":1126,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"keywords\":[\"Advise &amp; Consult\",\"construction\",\"Construction Defect Disputes\",\"Patent Construction Defects\",\"Practical Completion\"],\"articleSection\":[\"Construction\",\"Construction Defects\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/\",\"name\":\"When Do Defects Prevent Practical Completion? - Advise &amp; Consult, Inc.\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\"},\"datePublished\":\"2019-04-12T14:55:36+00:00\",\"description\":\"Mears Ltd v Costplan Services (S.E.) Ltd [2019] EWCA Civ 502 provides an important analysis of the interplay between patent defects and practical completion\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"name\":\"Advise &amp; Consult, Inc.\",\"description\":\"Construction Expert Witnesses\",\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\",\"name\":\"Advise & Consult\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"contentUrl\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"width\":162,\"height\":75,\"caption\":\"Advise & Consult\"},\"image\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\",\"https:\/\/x.com\/adviseconsult\",\"https:\/\/www.linkedin.com\/company-beta\/204526\/\",\"https:\/\/www.youtube.com\/user\/MrConstructionExpert\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/www.expertwitnessinconstruction.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"When Do Defects Prevent Practical Completion? - Advise &amp; Consult, Inc.","description":"Mears Ltd v Costplan Services (S.E.) Ltd [2019] EWCA Civ 502 provides an important analysis of the interplay between patent defects and practical completion","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/","og_locale":"en_US","og_type":"article","og_title":"When Do Defects Prevent Practical Completion? - Advise &amp; Consult, Inc.","og_description":"Mears Ltd v Costplan Services (S.E.) Ltd [2019] EWCA Civ 502 provides an important analysis of the interplay between patent defects and practical completion","og_url":"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/","og_site_name":"Advise &amp; Consult, Inc.","article_publisher":"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","article_published_time":"2019-04-12T14:55:36+00:00","author":"admin","twitter_card":"summary_large_image","twitter_creator":"@adviseconsult","twitter_site":"@adviseconsult","twitter_misc":{"Written by":"admin","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/#article","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/"},"author":{"name":"admin","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7"},"headline":"When Do Defects Prevent Practical Completion?","datePublished":"2019-04-12T14:55:36+00:00","mainEntityOfPage":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/"},"wordCount":1126,"commentCount":0,"publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"keywords":["Advise &amp; Consult","construction","Construction Defect Disputes","Patent Construction Defects","Practical Completion"],"articleSection":["Construction","Construction Defects"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/","name":"When Do Defects Prevent Practical Completion? - Advise &amp; Consult, Inc.","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website"},"datePublished":"2019-04-12T14:55:36+00:00","description":"Mears Ltd v Costplan Services (S.E.) Ltd [2019] EWCA Civ 502 provides an important analysis of the interplay between patent defects and practical completion","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.myconstructionexpert.com\/blog\/when-do-defects-prevent-practical-completion\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website","url":"https:\/\/www.myconstructionexpert.com\/blog\/","name":"Advise &amp; Consult, Inc.","description":"Construction Expert Witnesses","publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization","name":"Advise & Consult","url":"https:\/\/www.myconstructionexpert.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","contentUrl":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","width":162,"height":75,"caption":"Advise & Consult"},"image":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","https:\/\/x.com\/adviseconsult","https:\/\/www.linkedin.com\/company-beta\/204526\/","https:\/\/www.youtube.com\/user\/MrConstructionExpert"]},{"@type":"Person","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","caption":"admin"},"sameAs":["http:\/\/www.expertwitnessinconstruction.com"]}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2ztG6-3L1j","jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/895733","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/comments?post=895733"}],"version-history":[{"count":1,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/895733\/revisions"}],"predecessor-version":[{"id":895734,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/895733\/revisions\/895734"}],"wp:attachment":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/media?parent=895733"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/categories?post=895733"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/tags?post=895733"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}