{"id":899293,"date":"2021-11-02T14:39:38","date_gmt":"2021-11-02T20:39:38","guid":{"rendered":"https:\/\/www.myconstructionexpert.com\/blog\/?p=899293"},"modified":"2021-11-02T14:39:42","modified_gmt":"2021-11-02T20:39:42","slug":"pre-bid-report-impacts-of-disclaimer","status":"publish","type":"post","link":"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/","title":{"rendered":"Bidder Be Thoughtful: The Impacts of Disclaimers in Pre-Bid Reports"},"content":{"rendered":"\n<p>Joshua A. Morehouse | <a href=\"https:\/\/www.consensusdocs.org\/impacts-of-disclaimers-in-pre-bid-reports\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">ConsensusDocs<\/a><\/p>\n\n\n\n<p>When bidding a project, subsurface or latent site conditions that are not immediately apparent can massively impact the costs of performance to general contractors. Were contractors required to <a href=\"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-documents-not-trade-secrets\/\" target=\"_blank\" rel=\"noreferrer noopener\">bid on projects<\/a> without any information on pre-existing conditions, they would need either to be assured that any additional costs would be reimbursed by the owner, or to include significant contingencies for subsurface conditions in their bids. For owners, these options result in either increased risk or increased cost\u2014neither of which is particularly palatable. Owners therefore implement several contractual tools to minimize these risks and costs.<\/p>\n\n\n\n<p>One of these tools is providing bidders with a report on latent conditions, often called a \u201cgeotechnical data report\u201d or \u201cGDR\u201d, but otherwise shifting as much of the subsurface-related risk as possible to the contractor. In theory, these reports permit contractors to appropriately adjust their contingencies for latent conditions, thus saving owners money. However, several independent and thorny issues arise where site reports provided by the owner are either inconsistent with or silent on the actual conditions of a project site. Hence owners often include disclaimers with these reports, such as noting that the report is for \u201cinformational purposes only\u201d or that the report is \u201cnot part of the contract documents\u201d.<\/p>\n\n\n\n<p>Disclaimers such as these leave bidders in an awkward position. On one hand, the owner has provided a report for the presumptive purpose of permitting bidders to adjust their contingencies for latent conditions accordingly. On the other, bidders have been warned against considering the data in that report when formulating their bids. In the face of this contradiction, courts have taken a range of approaches to such disclaimers\u2014some enforce the disclaimer as written, while others decline to enforce disclaimers (or at least certain types of disclaimers) on public policy grounds. When contractors encounter an owner-provided site report accompanied by a disclaimer, it is therefore crucial that they understand both the jurisdiction that they are working in and the type of disclaimer at issue. In particular, contractors should be aware of three specific types of disclaimers: (1) general disclaimers of all data in the report provided, (2) requirements that the contractor perform pre-bid site investigations and reach its own conclusions with respect to a report, and (3) disclaimers that include only a particular factual portion of a report.<\/p>\n\n\n\n<p><strong><u>General Disclaimers<\/u><\/strong><\/p>\n\n\n\n<p>Most courts have taken the position that broad, general disclaimers of pre-bid reports provided by the owner are not enforceable. The Montana Supreme Court provided a thorough discussion of the policy considerations driving this position in&nbsp;<em>Haggart Construction Co. v. Montana State Highway Commission<\/em>, noting that an owner \u201cplaces itself in a contradictory position when on one hand it warrants the condition [of the site], but the next moment disclaims any liability arising from reliance on such representations.\u201d 427 P.2d 686 (Mont. 1967).<\/p>\n\n\n\n<p>The Federal Circuit\u2019s decision in&nbsp;<em>Metcalf Construction Co. v. United States<\/em>&nbsp;provides a practical application of that principle. 742 F.3d 984, 996 (Fed. Cir. 2014). There, the court held that a disclaimer stating that a soil report was \u201cfor preliminary information only\u201d did not absolve the owner when the information in that report turned out to be incorrect. Id. In reaching that decision, the court relied on \u201cthe longstanding background presumption against finding broad disclaimers of liability for changed conditions.\u201d Id. (citations omitted); see also United Contractors v. U.S., 368 F.2d 585, 598 (Fed. Cl. 1966) (holding that a statement that the owner \u201cdoes not guarantee that materials other than those disclosed by [its geotechnical report] will not be encountered, or that proportions of the various materials will not vary from those indicated by the logs of the explorations\u201d did not absolve the government from the contract\u2019s differing site conditions clause). It should be noted, however, that while&nbsp;<em>Metcalf&nbsp;<\/em>likely represents the majority position, other courts have enforced similar disclaimers as written without regard to public policy concerns. See, e.g.,&nbsp;<em>J.E. Brenneman Co. v. Pa. Dep\u2019t of Transp.<\/em>, 424 A.2d 592, 596 (Pa. Commw. Ct. 1981) (\u201cIn light of the exclusion of the test hole data from the agreement . . . the contract contains no indication of the subterranean materials which were to be expected.\u201d).<\/p>\n\n\n\n<p>Often for courts, the question comes down to whether a report provided by an owner was reasonably verifiable by the contractor and whether the contractor\u2019s reliance on that report was reasonable notwithstanding the disclaimer. In&nbsp;<em>Raymond International, Inc. v. Baltimore County<\/em>, for instance, an owner provided a geotechnical report with the disclaimer that the representations in the report were \u201cfurnished to the Contractor for general informational purposes only and do not purport to represent existing field conditions\u201d and urged bidders to conduct their own inspections. 412 A.2d 1296, 1300 (Md. App. 1980). However, the report provided by the owner took \u201calmost four years and innumerable test divings to compile.\u201d Id. at 1302. Given that, the Maryland Court of Special Appeals held that the contractor was entitled to rely on that report despite the caution that the report was for \u201cinformational purposes only,\u201d as it would be unreasonable to expect the contractor to independently perform an equivalent investigation.<\/p>\n\n\n\n<p><strong><u>Requirements that Contractors Perform Pre-Bid Site Inspection<\/u><\/strong><\/p>\n\n\n\n<p>Courts are less unified when dealing with provisions that require contractors to conduct pre-bid inspections of a project site. Though contracts typically contain provisions that a contractor has \u201cinvestigated and satisfied itself as to the general and local conditions which can affect the work or its costs,\u201d these provisions are often complied with only in the broadest sense. Issues of site access, bidding timelines, and cost usually limit the scale of the investigation that prospective bidders can conduct. As the Ohio Court of Common pleas described the contractor\u2019s problem over half a century ago:<\/p>\n\n\n\n<p>What were the bidders to do? Was each bidder to run these tremendously expensive core boring tests not knowing whether or not he would get the contract? Under defendant\u2019s contention there would be practically no bidders. A bidder would be faced with this dilemma. Shall I bid on what is presented to be and run the risk of loss if the information is not correct or shall I run core boring tests at great expense, amounting to thousands of dollars, which expense I must bear on my own if I do not secure the contract?&nbsp;<em>Condon-Cunningham, Inc. v. Day<\/em>, 258 N.E.2d 264, 274\u201375 (Ohio C.P. 1969).<\/p>\n\n\n\n<p>Several courts have therefore not required contractors to exhaust every possible investigative tool prior to bidding a project, provided that contractors take into account the \u201creasonably available information\u201d that a site inspection would reveal. See, e.g.,&nbsp;<em>Inland Dredging Co., L.L.C. v. Panama City Port Auth.<\/em>, No. 5:04 CV 280 RH\/WCS, 2005 WL 2133702 at *3 (N.D. Fla. Aug. 29, 2005).<\/p>\n\n\n\n<p>There exists some disagreement among courts, however, regarding the scope and effect of clauses such as these. The Appellate Division of the New York Supreme Court summarily dismissed an argument similar to that approved above:<\/p>\n\n\n\n<p>Plaintiff argues that his [sic] time was too limited to make an in-depth inspection and that such an inspection would have been prohibitively expensive. Nevertheless, it is what plaintiff obligated itself to do by signing the contract. No authority is cited for plaintiff\u2019s argument that such a contract is against public policy, and we reject it.&nbsp;<em>Costanza Constr. Corp. v. City of Rochester<\/em>, 147 A.2d 929, 929 (N.Y. App. Div. 1989).<\/p>\n\n\n\n<p>The Appellate Court of Connecticut reached the same conclusion when evaluating a contractor\u2019s claim that that subsurface highway conditions differed from those represented in the contract.&nbsp;<em>Empire Paving, Inc. v. City of Milford<\/em>, 747 A.2d 1063, 1068 (Conn. App. Ct. 2000). There, the contractor argued that it should not have been required to perform a subsurface investigation because \u201cbidders cannot be expected to tie up municipal streets to do their own test borings.\u201d Id. The court was unmoved, though. It held that the investigation provisions of the contract could not be disregarded, even despite the significant expense, as \u201conly in the most exceptional circumstances have courts concluded that a duty is discharged because additional financial burdens make performance less practical than initially contemplated.\u201d Id. The court thus felt itself bound by the language of the contract to reject the contractor\u2019s claim, despite the impracticality of conducting a thorough pre-bid site inspection.<\/p>\n\n\n\n<p>In short, where a contract requires that the contractor investigate site conditions, courts have split on the question of what type of \u201cinvestigation\u201d a contractor is obliged to take prior to bidding a contractor. Some only require contractors to consider that information reasonably available to them; others require contractors to undertake an exhaustive (and likely unfeasible) pre-bid investigation of the site.<\/p>\n\n\n\n<p><strong><u>Disclaimers of Specific Issues<\/u><\/strong><\/p>\n\n\n\n<p>As noted above, general disclaimers of site reports provided by an owner are not always enforced. Hence owners will sometimes limit their disclaimers to particular parts of the report that they provide to prospective bidders. Courts have typically been more inclined to enforce these kinds of disclaimers than they are to enforce general disclaimers. The Texas Supreme Court, for example, has enforced a disclaimer that required the contractor to \u201cconfirm the location of all such [utility] crossings,\u201d despite the contract\u2019s specific requirement that the owner would \u201chave exercised due diligence\u201d in locating those crossings.&nbsp;<em>El Paso Field Servs., L.P. v. MasTec N. Am., Inc.<\/em>, 389 S.W.3d 802, 807 (Tex. 2012). Similarly, the Federal Circuit enforced a contractual provision that directed bidders to information in the possession of a third-party regarding quantities of salvageable steel on the project site but explicitly disclaimed the \u201cavailability\u201d of the steel shown in those documents<em>. P.J. Maffei Bldg. Wrecking Corp. v. U.S.<\/em>, 734 F.2d 913, 917 (Fed. Cir. 1984).<\/p>\n\n\n\n<p><strong><u>Conclusion<\/u><\/strong><\/p>\n\n\n\n<p>The ability of owners to disclaim the accuracy of reports they provide to prospective bidders depends on several factors, including the type of disclaimer at issue and the governing law of the contract. Contractors must therefore be careful to take both elements into account when bidding on a contract with such a disclaimer and must adequately account for the risks inherent in these provisions.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Joshua A. Morehouse | ConsensusDocs When bidding a project, subsurface or latent site conditions that are not immediately apparent can massively impact the costs of performance to general contractors. Were contractors required to bid on projects without any information on pre-existing conditions, they would need either to be assured that any additional costs would be&hellip; <a class=\"more-link\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/\">Continue reading <span class=\"screen-reader-text\">Bidder Be Thoughtful: The Impacts of Disclaimers in Pre-Bid Reports<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[14],"tags":[9895,9817,11437],"class_list":["post-899293","post","type-post","status-publish","format-standard","hentry","category-construction-2","tag-advise-consult","tag-bidding","tag-pre-bid-documents","entry"],"jetpack_publicize_connections":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Bidder Be Thoughtful: The Impacts of Disclaimers in Pre-Bid Reports - Advise &amp; Consult, Inc.<\/title>\n<meta name=\"description\" content=\"When bidding a project, subsurface or latent site conditions that are not immediately apparent can massively impact the costs\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bidder Be Thoughtful: The Impacts of Disclaimers in Pre-Bid Reports - Advise &amp; Consult, Inc.\" \/>\n<meta property=\"og:description\" content=\"When bidding a project, subsurface or latent site conditions that are not immediately apparent can massively impact the costs\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/\" \/>\n<meta property=\"og:site_name\" content=\"Advise &amp; Consult, Inc.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-11-02T20:39:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-11-02T20:39:42+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:site\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\"},\"headline\":\"Bidder Be Thoughtful: The Impacts of Disclaimers in Pre-Bid Reports\",\"datePublished\":\"2021-11-02T20:39:38+00:00\",\"dateModified\":\"2021-11-02T20:39:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/\"},\"wordCount\":1678,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"keywords\":[\"Advise &amp; Consult\",\"Bidding\",\"Pre-Bid Documents\"],\"articleSection\":[\"Construction\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/\",\"name\":\"Bidder Be Thoughtful: The Impacts of Disclaimers in Pre-Bid Reports - Advise &amp; Consult, Inc.\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\"},\"datePublished\":\"2021-11-02T20:39:38+00:00\",\"dateModified\":\"2021-11-02T20:39:42+00:00\",\"description\":\"When bidding a project, subsurface or latent site conditions that are not immediately apparent can massively impact the costs\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"name\":\"Advise &amp; Consult, Inc.\",\"description\":\"Construction Expert Witnesses\",\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\",\"name\":\"Advise & Consult\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"contentUrl\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"width\":162,\"height\":75,\"caption\":\"Advise & Consult\"},\"image\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\",\"https:\/\/x.com\/adviseconsult\",\"https:\/\/www.linkedin.com\/company-beta\/204526\/\",\"https:\/\/www.youtube.com\/user\/MrConstructionExpert\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/www.expertwitnessinconstruction.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bidder Be Thoughtful: The Impacts of Disclaimers in Pre-Bid Reports - Advise &amp; Consult, Inc.","description":"When bidding a project, subsurface or latent site conditions that are not immediately apparent can massively impact the costs","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/","og_locale":"en_US","og_type":"article","og_title":"Bidder Be Thoughtful: The Impacts of Disclaimers in Pre-Bid Reports - Advise &amp; Consult, Inc.","og_description":"When bidding a project, subsurface or latent site conditions that are not immediately apparent can massively impact the costs","og_url":"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/","og_site_name":"Advise &amp; Consult, Inc.","article_publisher":"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","article_published_time":"2021-11-02T20:39:38+00:00","article_modified_time":"2021-11-02T20:39:42+00:00","author":"admin","twitter_card":"summary_large_image","twitter_creator":"@adviseconsult","twitter_site":"@adviseconsult","twitter_misc":{"Written by":"admin","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/#article","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/"},"author":{"name":"admin","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7"},"headline":"Bidder Be Thoughtful: The Impacts of Disclaimers in Pre-Bid Reports","datePublished":"2021-11-02T20:39:38+00:00","dateModified":"2021-11-02T20:39:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/"},"wordCount":1678,"commentCount":0,"publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"keywords":["Advise &amp; Consult","Bidding","Pre-Bid Documents"],"articleSection":["Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/","name":"Bidder Be Thoughtful: The Impacts of Disclaimers in Pre-Bid Reports - Advise &amp; Consult, Inc.","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website"},"datePublished":"2021-11-02T20:39:38+00:00","dateModified":"2021-11-02T20:39:42+00:00","description":"When bidding a project, subsurface or latent site conditions that are not immediately apparent can massively impact the costs","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.myconstructionexpert.com\/blog\/pre-bid-report-impacts-of-disclaimer\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website","url":"https:\/\/www.myconstructionexpert.com\/blog\/","name":"Advise &amp; Consult, Inc.","description":"Construction Expert Witnesses","publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization","name":"Advise & Consult","url":"https:\/\/www.myconstructionexpert.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","contentUrl":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","width":162,"height":75,"caption":"Advise & Consult"},"image":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","https:\/\/x.com\/adviseconsult","https:\/\/www.linkedin.com\/company-beta\/204526\/","https:\/\/www.youtube.com\/user\/MrConstructionExpert"]},{"@type":"Person","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","caption":"admin"},"sameAs":["http:\/\/www.expertwitnessinconstruction.com"]}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2ztG6-3LWJ","jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/899293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/comments?post=899293"}],"version-history":[{"count":1,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/899293\/revisions"}],"predecessor-version":[{"id":899294,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/899293\/revisions\/899294"}],"wp:attachment":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/media?parent=899293"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/categories?post=899293"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/tags?post=899293"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}