{"id":899420,"date":"2021-12-15T15:18:14","date_gmt":"2021-12-15T22:18:14","guid":{"rendered":"https:\/\/www.myconstructionexpert.com\/blog\/?p=899420"},"modified":"2021-12-15T15:18:56","modified_gmt":"2021-12-15T22:18:56","slug":"liens-licensing-boards-supply-chain","status":"publish","type":"post","link":"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/","title":{"rendered":"Construction Conversations around the Licensing Board, Liens, and the Supply Chain"},"content":{"rendered":"\n<p>Merrill Jones | <a href=\"https:\/\/www.wardandsmith.com\/articles\/construction-conversations-around-the-licensing-board-liens-and-the-supply-chain\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Ward and Smith<\/a><\/p>\n\n\n\n<p>My colleagues and I recently provided key updates on <a href=\"https:\/\/www.myconstructionexpert.com\/blog\/material-price-escalations-supply-chain\/\" target=\"_blank\" rel=\"noreferrer noopener\">supply chain disruption<\/a>, <a href=\"https:\/\/www.myconstructionexpert.com\/blog\/mechanics-lien-bonding-off\/\" target=\"_blank\" rel=\"noreferrer noopener\">liens<\/a>, and <a href=\"https:\/\/www.myconstructionexpert.com\/blog\/contractor-license-working-without\/\" target=\"_blank\" rel=\"noreferrer noopener\">licensing boards<\/a> during the firm\u2019s 2021 Construction Conversations Webinar.<\/p>\n\n\n\n<p>In the Rapid-Fire Legal Update session, we covered a variety of topics relevant to the construction industry, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Dealing with the North Carolina Licensing Board for General Contractors<\/li><li>Ongoing supply chain issues<\/li><li>Lien law best practices<\/li><li>Economic loss rule<\/li><\/ul>\n\n\n\n<p>This article summarizes the main takeaways.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Licensing Boards<\/strong><\/h3>\n\n\n\n<p>My law partner,\u00a0Evan Musselwhite, a construction litigator who advises contractors, subcontractors, owners, and design professionals about the construction and development process, started the session with important considerations for general contractors dealing with a licensing board complaint. Before delving into these issues, Musselwhite provided an overview of the intricacies of when a general contractor&#8217;s license is required and the importance of strictly following licensing regulations.<\/p>\n\n\n\n<p>Aside from the Board having the ability to restrict, suspend or revoke a license, Musselwhite said another negative outcome could result from failing to pay careful attention to licensing rules and regulations.<\/p>\n\n\n\n<p>A contract is generally unenforceable by the general contractor if it does not have the required license. Strict compliance with the licensing rules and regulations, not substantial compliance, is the rule.<\/p>\n\n\n\n<p>\u201cThe courts here consider that an illegal contract,\u201d said Musselwhite. \u201cThat means if you complete the entire project and do all the work perfectly, that owner doesn\u2019t have to pay you, and you can\u2019t go to the courts to enforce that contract to try to get paid.\u201d<\/p>\n\n\n\n<p>Some view this as a very harsh result, especially from a collectability standpoint. \u201cA lot of times, this is a big windfall for owners, but that is just the way the courts have interpreted these regulations because they feel they deal with the health and safety of the public,\u201d Musselwhite explained.<\/p>\n\n\n\n<p>The question of who actually needs a license is more complex than it seems. \u201cEvery corporation, partnership, and LLC has to have its own license in its own name if it\u2019s practicing general contracting within the state,\u201d noted Musselwhite.<\/p>\n\n\n\n<p>He added that, in general, each member of a joint venture has to have a license. \u201cSometimes there can be confusion over an unlicensed entity wanting to team up with a licensed contractor to do a project under a joint venture and thinking if we team up with them and they are licensed, then we are OK, but that is&nbsp;<strong>not<\/strong>&nbsp;how it works,\u201d said Musselwhite. To avoid disciplinary action, each joint venture member would require a license, or the joint venture itself could obtain its own license.<\/p>\n\n\n\n<p>As far as what the Board is looking for when it gets a complaint, the bases for disciplinary action include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Unauthorized practice of general contracting<\/li><li>Fraud or deceit in obtaining a license<\/li><li>Gross negligence, incompetency, or misconduct in the practice of the profession<\/li><li>Willful violation of licensing statutes<\/li><\/ul>\n\n\n\n<p>Musselwhite explained that it is important to cooperate with the Board when faced with a complaint.&nbsp; \u201cIt\u2019s important to be proactive about a complaint; keep and maintain all records, and don\u2019t try to defend an indefensible position,\u201d advises Musselwhite. \u201cOne of the worst things to do is to try to cover something up or make a misrepresentation to the Board, as it\u2019s much more likely to have a harsh consequence.\u201d&nbsp;<\/p>\n\n\n\n<p>Honesty is the best policy when dealing with the North Carolina Licensing Board for General Contractors.&nbsp; Some issues may have originated from a simple mistake or oversight that can be explained to the Board. Musselwhite explains:&nbsp; \u201cThe Board wants acknowledgment of a mistake, if there was one, someone to take responsibility for it, and what steps you will take to ensure that the issue doesn\u2019t happen again.\u201d<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Supply Chain Issues<\/strong><\/h3>\n\n\n\n<p>As a business attorney with decades of experience representing contractors, design professionals, and project owners, I have increasingly fielded a multitude of questions about dealing with supply chain disruption in recent months. As noted, \u201c[t]he global pandemic has caused shortages of materials, components, and equipment at a level most of us have never seen, &nbsp;and this has caused rapidly escalating prices, unpredictable delivery times and ultimately, more risk for contractors and subcontractors.\u201d<\/p>\n\n\n\n<p>The mindset of doing business as usual is simply not going to work anymore. To help contractors and subcontractors adapt to the modern business environment, I provided a number of steps for minimizing risk, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Communicate early and often about supply chain issues, set clear expectations<\/li><li>Provide for price increases in the contract based on market changes<\/li><li>Use allowances for volatile materials that could fluctuate in price<\/li><li>Work with the owner(s) to buy materials in advance<\/li><li>Include material shortage as a reason for additional time or delays<\/li><\/ul>\n\n\n\n<p>\u201cIf you can educate all the parties, they may be convinced to do things differently. We need to recognize the market we\u2019re in and create specific carve-outs in contracts for problems related to epidemics, pandemics, and material shortages.\u201d<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Lien Law Update<\/strong><\/h3>\n\n\n\n<p>Luke Tompkins, a commercial litigator, provided guidance and best practices for navigating lien laws.<\/p>\n\n\n\n<p>Tompkins noted that there have been no significant changes to North Carolina lien laws since 2013 when lien agent requirements were added. He advised contractors to post building permits and lien agent information conspicuously on the job site.<\/p>\n\n\n\n<p>Also, contractors and subcontractors should serve a notice to the lien agent no later than 15 days after furnishing labor or material at the job site. Failing to do so shifts the priority of any lien claims from the date of first furnishing to the date where the lien is actually filed and perfected.<\/p>\n\n\n\n<p>\u201cThis can have vast consequences because if other subcontractors do this process correctly and get everything in place before you file your lien, and you didn\u2019t serve the notice to the lien agent, you could lose your ability to recover,\u201d Tompkins explained.<\/p>\n\n\n\n<p>To be safe, Tompkins recommended that, \u201cEvery time you begin work on a project, get the lien agent information, serve that notice to the lien agent and maintain proof that you served the lien agent by using certified mail or another method of service by which you can show receipt of service.&#8221;<\/p>\n\n\n\n<p>Tompkins also strongly suggests that contractors post and file a notice of contract to guard against the threat of double payment. On the other hand, subcontractors should check to see if a notice of contract has been posted on the job site and, if so, should serve the contractor with a notice of subcontract to preserve their right to file a lien on real property.<\/p>\n\n\n\n<p>Lastly, Tompkins emphasized the importance of asserting lien claims in a timely fashion. A lien on real property must be filed within 120 days of the last furnishing of work or materials and enforced by legal action within 180 days of the last furnishing. Waiting until the last minute to file and enforce your lien on real property can result in a loss of your claim. Likewise, it is paramount to give notice of a claim of lien on funds as soon as it becomes clear that a payment is late and not forthcoming.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Economic Loss Rule<\/strong><\/h3>\n\n\n\n<p>Bill Durr, a construction litigator, weighed in on a recent North Carolina Supreme Court decision addressing the application of the economic loss rule.<\/p>\n\n\n\n<p>In the case,&nbsp;<em>Crescent University City Venture, LLC v. Trussway Manufacturing, Inc.<\/em>, a commercial property owner brought a lawsuit against a general contractor and the manufacturer of the trusses used in the project.<\/p>\n\n\n\n<p>\u201cAs is often the case, this dispute involved a property owner looking for as many deep pockets as they can possibly find,\u201d said Durr.<\/p>\n\n\n\n<p>The owner sought to make a direct claim against the truss manufacturer, alleging the trusses were negligently manufactured.&nbsp; The North Carolina Supreme Court affirmed the ruling from the Business Court, holding that the only means of recovery would be against the general contractor since there was no contract between the owner and manufacturer.<\/p>\n\n\n\n<p>\u201cThis decision clarifies the applicability of the economic loss rule in the context of commercial construction projects, especially where the property owner is an experienced real estate developer,\u201d added Durr.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Questions and Answers<\/strong><\/h3>\n\n\n\n<p>At the close of the webinar, the moderator opened the floor for questions. One attendee wanted to know:&nbsp; \u201cCan I fire an employee for refusing to wear a mask while working?\u201d<\/p>\n\n\n\n<p>\u201cYes, if you go through the right process,\u201d said\u00a0Emily Massey, a labor and employment attorney. \u201cThe first question to ask is, \u2018Is this for a medical or religious accommodation?\u2019 We have seen terminations happen: the key is to engage legal counsel, have multiple conversations, and document the process.\u201d<\/p>\n\n\n\n<p>Another attendee asked, \u201cDoes the economic loss rule apply to single-family homes?\u201d<\/p>\n\n\n\n<p>\u201cI think you can argue it does apply,\u201d said Durr. \u201cI think the courts would look at whether there is a right of recovery in the contract. Courts will take a firmer view in regards to a commercial contract, but they may give the benefit of the doubt to a homeowner with less experience negotiating contract terms.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Merrill Jones | Ward and Smith My colleagues and I recently provided key updates on supply chain disruption, liens, and licensing boards during the firm\u2019s 2021 Construction Conversations Webinar. In the Rapid-Fire Legal Update session, we covered a variety of topics relevant to the construction industry, including: Dealing with the North Carolina Licensing Board for&hellip; <a class=\"more-link\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/\">Continue reading <span class=\"screen-reader-text\">Construction Conversations around the Licensing Board, Liens, and the Supply Chain<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[14,10772],"tags":[9895,11596,184,11595],"class_list":["post-899420","post","type-post","status-publish","format-standard","hentry","category-construction-2","category-mechanics-lien-law","tag-advise-consult","tag-licensing-board","tag-mechanics-lien-law","tag-supply-chain","entry"],"jetpack_publicize_connections":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Construction Conversations around the Licensing Board, Liens, and the Supply Chain - Advise &amp; Consult, Inc.<\/title>\n<meta name=\"description\" content=\"key updates on supply chain disruption, liens, and licensing boards during the firm\u2019s 2021 Construction Conversations Webinar\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Conversations around the Licensing Board, Liens, and the Supply Chain - Advise &amp; Consult, Inc.\" \/>\n<meta property=\"og:description\" content=\"key updates on supply chain disruption, liens, and licensing boards during the firm\u2019s 2021 Construction Conversations Webinar\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/\" \/>\n<meta property=\"og:site_name\" content=\"Advise &amp; Consult, Inc.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-12-15T22:18:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-12-15T22:18:56+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:site\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\"},\"headline\":\"Construction Conversations around the Licensing Board, Liens, and the Supply Chain\",\"datePublished\":\"2021-12-15T22:18:14+00:00\",\"dateModified\":\"2021-12-15T22:18:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/\"},\"wordCount\":1522,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"keywords\":[\"Advise &amp; Consult\",\"Licensing Board\",\"Mechanics Lien Law\",\"Supply Chain\"],\"articleSection\":[\"Construction\",\"Mechanics Lien Law\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/\",\"name\":\"Construction Conversations around the Licensing Board, Liens, and the Supply Chain - Advise &amp; Consult, Inc.\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\"},\"datePublished\":\"2021-12-15T22:18:14+00:00\",\"dateModified\":\"2021-12-15T22:18:56+00:00\",\"description\":\"key updates on supply chain disruption, liens, and licensing boards during the firm\u2019s 2021 Construction Conversations Webinar\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"name\":\"Advise &amp; Consult, Inc.\",\"description\":\"Construction Expert Witnesses\",\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\",\"name\":\"Advise & Consult\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"contentUrl\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"width\":162,\"height\":75,\"caption\":\"Advise & Consult\"},\"image\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\",\"https:\/\/x.com\/adviseconsult\",\"https:\/\/www.linkedin.com\/company-beta\/204526\/\",\"https:\/\/www.youtube.com\/user\/MrConstructionExpert\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/www.expertwitnessinconstruction.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Conversations around the Licensing Board, Liens, and the Supply Chain - Advise &amp; Consult, Inc.","description":"key updates on supply chain disruption, liens, and licensing boards during the firm\u2019s 2021 Construction Conversations Webinar","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/","og_locale":"en_US","og_type":"article","og_title":"Construction Conversations around the Licensing Board, Liens, and the Supply Chain - Advise &amp; Consult, Inc.","og_description":"key updates on supply chain disruption, liens, and licensing boards during the firm\u2019s 2021 Construction Conversations Webinar","og_url":"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/","og_site_name":"Advise &amp; Consult, Inc.","article_publisher":"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","article_published_time":"2021-12-15T22:18:14+00:00","article_modified_time":"2021-12-15T22:18:56+00:00","author":"admin","twitter_card":"summary_large_image","twitter_creator":"@adviseconsult","twitter_site":"@adviseconsult","twitter_misc":{"Written by":"admin","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/#article","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/"},"author":{"name":"admin","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7"},"headline":"Construction Conversations around the Licensing Board, Liens, and the Supply Chain","datePublished":"2021-12-15T22:18:14+00:00","dateModified":"2021-12-15T22:18:56+00:00","mainEntityOfPage":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/"},"wordCount":1522,"commentCount":0,"publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"keywords":["Advise &amp; Consult","Licensing Board","Mechanics Lien Law","Supply Chain"],"articleSection":["Construction","Mechanics Lien Law"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/","name":"Construction Conversations around the Licensing Board, Liens, and the Supply Chain - Advise &amp; Consult, Inc.","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website"},"datePublished":"2021-12-15T22:18:14+00:00","dateModified":"2021-12-15T22:18:56+00:00","description":"key updates on supply chain disruption, liens, and licensing boards during the firm\u2019s 2021 Construction Conversations Webinar","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.myconstructionexpert.com\/blog\/liens-licensing-boards-supply-chain\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website","url":"https:\/\/www.myconstructionexpert.com\/blog\/","name":"Advise &amp; Consult, Inc.","description":"Construction Expert Witnesses","publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization","name":"Advise & Consult","url":"https:\/\/www.myconstructionexpert.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","contentUrl":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","width":162,"height":75,"caption":"Advise & Consult"},"image":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","https:\/\/x.com\/adviseconsult","https:\/\/www.linkedin.com\/company-beta\/204526\/","https:\/\/www.youtube.com\/user\/MrConstructionExpert"]},{"@type":"Person","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","caption":"admin"},"sameAs":["http:\/\/www.expertwitnessinconstruction.com"]}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2ztG6-3LYM","jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/899420","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/comments?post=899420"}],"version-history":[{"count":1,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/899420\/revisions"}],"predecessor-version":[{"id":899421,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/899420\/revisions\/899421"}],"wp:attachment":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/media?parent=899420"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/categories?post=899420"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/tags?post=899420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}