{"id":900942,"date":"2023-03-14T15:41:23","date_gmt":"2023-03-14T21:41:23","guid":{"rendered":"https:\/\/www.myconstructionexpert.com\/blog\/?p=900942"},"modified":"2023-03-14T15:41:28","modified_gmt":"2023-03-14T21:41:28","slug":"scope-of-work-construction-contract","status":"publish","type":"post","link":"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/","title":{"rendered":"Construction Contract&#8217;s Scope of Work Should be Written with Clarity"},"content":{"rendered":"\n<p>David Adelstein | <a href=\"https:\/\/www.floridaconstructionlegalupdates.com\/construction-contracts-scope-of-work-should-be-written-with-clarity\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Florida Construction Legal Updates<\/a><\/p>\n\n\n\n<p>The\u00a0<strong><a href=\"https:\/\/www.myconstructionexpert.com\/blog\/modular-construction-construction-contract\/\" target=\"_blank\" rel=\"noreferrer noopener\">scope of work<\/a> section<\/strong>\u00a0in your construction contract should never be overlooked. \u00a0In numerous instances, it is overlooked which leads to a dispute as to the precise nature of the scope of work. This dispute could be the result of an ambiguity in the scope of work section. Or it could be the result of an omission. Or it could be the result of a lack of clarification. Or it could be the result of not properly reviewing and vetting the scope of work section. This is a section\u2014whether included in the body of your contract or attached as an exhibit\u2014you absolutely, positively want clarity. Otherwise, you are potentially setting yourself up for a future dispute that could include (i) an additional work \/ change order dispute, (ii) an incomplete work dispute, or (iii) a failure to properly perform your work dispute. These are all disputes you want to avoid, and many times can avoid, by going through and negotiating the scope of work section to bring clarity to this section. Remember, clarity is a positive. Ambiguity or uncertainty is a negative.<\/p>\n\n\n\n<p>An example of such an avoidable scope of work dispute can be found in&nbsp;<em>All Year Cooling and Heating, Inc. v. Burkett Properties, Inc<\/em>., 2023 WL 2000991 (Fla. 4<sup>th<\/sup>&nbsp;DCA 2023).&nbsp; Here, an air conditioning contractor was hired to install six new split air conditioning systems. The scope of work provided that there were currently \u201ctwo split systems that are currently existing, working perfectly and are not to be replaced as part of this contract.\u201d&nbsp; The property manager claimed the air conditioning contractor was required to bring these two existing split air conditioning systems up to code as the contract provided that notwithstanding anything to the contrary, the contractor \u201cwill certify and shall ensure that all split systems in the building, upon completion of all the work, will be fully compliant with all codes and regulations and shall be responsible for any costs relates to the implementation and\/or remediation of same.\u201d<\/p>\n\n\n\n<p>The air conditioning contractor disputed this added scope of work. &nbsp;After a bench trial, the trial court entered a judgment in favor of the property manager and against the air conditioning contractor.<\/p>\n\n\n\n<p>On appeal, the trial court\u2019s judgment was reversed and remanded back to the trial court for entry of a judgment in favor of the air conditioning contractor.<\/p>\n\n\n\n<p><strong>However, we do not read this code compliance provision as encompassing the existing split systems that were excluded from the contract\u2019s scope of work.<\/strong><\/p>\n\n\n\n<p><strong>Here, the general purpose of the contract as a whole \u2013 including pricing \u2013 was for the installation of six new split systems and the disposal of the old water tower.&nbsp; And the paragraph addressing the scope of work made it clear that the [two] existing split systems were \u201cworking perfectly\u201d and were \u201cnot to be replaced as part of this contract.\u201d Despite the use of the word \u201cnotwithstanding,\u201d the code compliance provision must be read in a way that is compatible with the contract as a whole.<\/strong><\/p>\n\n\n\n<p>****<\/p>\n\n\n\n<p><strong>The contract required the Contractor to ensure that the six split systems it installed were code compliant, and nothing more.<\/strong><\/p>\n\n\n\n<p><em>All Year Heating and Cooling, supra<\/em>, at *2.<\/p>\n\n\n\n<p>If the property manager wanted or expected the existing split air conditioning systems to be brought up to code, it should have ensured this language was included in the scope of work section. \u00a0It may have warranted additional pricing, but it would have avoided this dispute. And perhaps the contractor could have clearly excluded any work regarding the existing split air conditioning systems, although it did include language that such work was not part of the contract. \u00a0The objective always remains to bring clarity to the scope of work section.<\/p>\n\n\n\n<hr class=\"wp-block-separator\"\/>\n\n\n\n<p><strong>When one of your cases is in need of a construction expert, estimates, insurance appraisal or umpire services in defect or insurance disputes &#8211; please call Advise &amp; Consult, Inc. at 888.684.8305, or email <a href=\"mailto:experts@adviseandconsult.net\" target=\"_blank\" rel=\"noreferrer noopener\">experts@adviseandconsult.net<\/a>.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>David Adelstein | Florida Construction Legal Updates The\u00a0scope of work section\u00a0in your construction contract should never be overlooked. \u00a0In numerous instances, it is overlooked which leads to a dispute as to the precise nature of the scope of work. This dispute could be the result of an ambiguity in the scope of work section. Or&hellip; <a class=\"more-link\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/\">Continue reading <span class=\"screen-reader-text\">Construction Contract&#8217;s Scope of Work Should be Written with Clarity<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[9],"tags":[9895,224,8903],"class_list":["post-900942","post","type-post","status-publish","format-standard","hentry","category-construction-contracts","tag-advise-consult","tag-construction-contract","tag-scope-of-work","entry"],"jetpack_publicize_connections":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Construction Contract&#039;s Scope of Work Should be Written with Clarity - Advise &amp; Consult, Inc.<\/title>\n<meta name=\"description\" content=\"scope of work in your construction contract should never be overlooked which leads to a dispute as to the precise nature of the scope of work\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Contract&#039;s Scope of Work Should be Written with Clarity - Advise &amp; Consult, Inc.\" \/>\n<meta property=\"og:description\" content=\"scope of work in your construction contract should never be overlooked which leads to a dispute as to the precise nature of the scope of work\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/\" \/>\n<meta property=\"og:site_name\" content=\"Advise &amp; Consult, Inc.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\" \/>\n<meta property=\"article:published_time\" content=\"2023-03-14T21:41:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-03-14T21:41:28+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:site\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\"},\"headline\":\"Construction Contract&#8217;s Scope of Work Should be Written with Clarity\",\"datePublished\":\"2023-03-14T21:41:23+00:00\",\"dateModified\":\"2023-03-14T21:41:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/\"},\"wordCount\":680,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"keywords\":[\"Advise &amp; Consult\",\"Construction Contract\",\"Scope of Work\"],\"articleSection\":[\"Construction Contracts\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/\",\"name\":\"Construction Contract's Scope of Work Should be Written with Clarity - Advise &amp; Consult, Inc.\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\"},\"datePublished\":\"2023-03-14T21:41:23+00:00\",\"dateModified\":\"2023-03-14T21:41:28+00:00\",\"description\":\"scope of work in your construction contract should never be overlooked which leads to a dispute as to the precise nature of the scope of work\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"name\":\"Advise &amp; Consult, Inc.\",\"description\":\"Construction Expert Witnesses\",\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\",\"name\":\"Advise & Consult\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"contentUrl\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"width\":162,\"height\":75,\"caption\":\"Advise & Consult\"},\"image\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\",\"https:\/\/x.com\/adviseconsult\",\"https:\/\/www.linkedin.com\/company-beta\/204526\/\",\"https:\/\/www.youtube.com\/user\/MrConstructionExpert\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/www.expertwitnessinconstruction.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Contract's Scope of Work Should be Written with Clarity - Advise &amp; Consult, Inc.","description":"scope of work in your construction contract should never be overlooked which leads to a dispute as to the precise nature of the scope of work","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/","og_locale":"en_US","og_type":"article","og_title":"Construction Contract's Scope of Work Should be Written with Clarity - Advise &amp; Consult, Inc.","og_description":"scope of work in your construction contract should never be overlooked which leads to a dispute as to the precise nature of the scope of work","og_url":"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/","og_site_name":"Advise &amp; Consult, Inc.","article_publisher":"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","article_published_time":"2023-03-14T21:41:23+00:00","article_modified_time":"2023-03-14T21:41:28+00:00","author":"admin","twitter_card":"summary_large_image","twitter_creator":"@adviseconsult","twitter_site":"@adviseconsult","twitter_misc":{"Written by":"admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/#article","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/"},"author":{"name":"admin","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7"},"headline":"Construction Contract&#8217;s Scope of Work Should be Written with Clarity","datePublished":"2023-03-14T21:41:23+00:00","dateModified":"2023-03-14T21:41:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/"},"wordCount":680,"commentCount":0,"publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"keywords":["Advise &amp; Consult","Construction Contract","Scope of Work"],"articleSection":["Construction Contracts"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/","name":"Construction Contract's Scope of Work Should be Written with Clarity - Advise &amp; Consult, Inc.","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website"},"datePublished":"2023-03-14T21:41:23+00:00","dateModified":"2023-03-14T21:41:28+00:00","description":"scope of work in your construction contract should never be overlooked which leads to a dispute as to the precise nature of the scope of work","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.myconstructionexpert.com\/blog\/scope-of-work-construction-contract\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website","url":"https:\/\/www.myconstructionexpert.com\/blog\/","name":"Advise &amp; Consult, Inc.","description":"Construction Expert Witnesses","publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization","name":"Advise & Consult","url":"https:\/\/www.myconstructionexpert.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","contentUrl":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","width":162,"height":75,"caption":"Advise & Consult"},"image":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","https:\/\/x.com\/adviseconsult","https:\/\/www.linkedin.com\/company-beta\/204526\/","https:\/\/www.youtube.com\/user\/MrConstructionExpert"]},{"@type":"Person","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","caption":"admin"},"sameAs":["http:\/\/www.expertwitnessinconstruction.com"]}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2ztG6-3Mnk","jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/900942","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/comments?post=900942"}],"version-history":[{"count":1,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/900942\/revisions"}],"predecessor-version":[{"id":900944,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/900942\/revisions\/900944"}],"wp:attachment":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/media?parent=900942"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/categories?post=900942"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/tags?post=900942"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}