{"id":901569,"date":"2023-09-05T15:20:38","date_gmt":"2023-09-05T21:20:38","guid":{"rendered":"https:\/\/www.myconstructionexpert.com\/blog\/?p=901569"},"modified":"2023-09-05T15:20:41","modified_gmt":"2023-09-05T21:20:41","slug":"bid-build-federal-dollars","status":"publish","type":"post","link":"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/","title":{"rendered":"Federal Dollars are Nice to Get, but Owners, Designers, and Builders Need to Watch Out for Those Strings"},"content":{"rendered":"\n<p>Alexandra Ferri and James Norment | <a href=\"https:\/\/www.wardandsmith.com\/articles\/federal-dollars-are-nice-to-get-but-owners-designers-and-builders-need-to-watch-out-for-those-strings\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Ward and Smith<\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\">North Carolina statutes permit State agencies and local governments (the &#8220;government&#8221;) to use alternatives to traditional bid-build approaches to construction.\u00a0<\/h4>\n\n\n\n<p>Two popular options are construction manager at risk and design-build delivery methods. \u00a0The\u00a0North Carolina General Statutes\u00a0set out the method the government must use in determining the winning bid.<\/p>\n\n\n\n<p>However, many public building projects use at least some federal dollars. &nbsp;And there are strings attached to the federal funds.&nbsp; The most important federal requirement is that the construction project&#8217;s procurement process must comply with the federal rules, commonly called the Uniform Guidance.<\/p>\n\n\n\n<p>The problem?&nbsp; State procurement law and the Uniform Guidance can be inconsistent and, at times,&nbsp;<strong>mutually exclusive<\/strong>.<\/p>\n\n\n\n<p>Take the design-build process, for example.<\/p>\n\n\n\n<p>North Carolina law has historically disfavored the design-build delivery method.\u00a0 In fact, this method was generally not permissible on North Carolina public projects until 2013.\u00a0 Despite the fact that the design-build delivery method is often cheaper and quicker than other methods, some governments see it as a newer delivery method and is, thus, deemed risky.\u00a0 Also, its unique nature requires multiple licensed professionals (general contractors, architects, and engineers) to walk the fine line between working together and not engaging in unlicensed practice of a profession.\u00a0 For example, general contractors must be careful not to act like unlicensed architects. \u00a0This intricate dance was discussed in our\u00a0<a href=\"https:\/\/www.wardandsmith.com\/articles\/the-design-build-contract-blueprint-exploring-the-boundaries-of-architectural-services-for-general-contractors\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">previous article<\/a>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Federal Dollars: Intended to Make Things Better, but\u2026<\/strong><\/h3>\n\n\n\n<p>Public projects that spend federal dollars are required to follow federal regulations, commonly called the &#8220;<a href=\"https:\/\/www.ecfr.gov\/current\/title-2\/subtitle-A\/chapter-II\/part-200?toc=1\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Uniform Guidance<\/a>&#8221; (primarily located in Part 200 of Title 2 of the Code of Federal Regulations),\u00a0<em><u>plus<\/u><\/em>\u00a0North Carolina law. \u00a0This is the case for all public projects, not just those that utilize the design-build delivery method. However, because North Carolina has enacted laws that are unique to the design-build delivery method, they do not always align with the Uniform Guidance.<\/p>\n\n\n\n<p>In some cases, the Uniform Guidance takes an opposite direction compared to North Carolina&#8217;s statutes.&nbsp; This is most prevalent in the selection phase of design-build contract procurement.<\/p>\n\n\n\n<p>Under North Carolina law, when the government solicits bids for a design-build contract, it is required to select firms that are qualified to perform under a design-build contract with &#8220;demonstrated competence and qualification.&#8221;&nbsp; Notably, the government must analyze the bidders &#8220;<strong>without regard to fee<\/strong>.&#8221;&nbsp; Once the winning bid has been selected, the entity will&nbsp;<em><u>only then<\/u><\/em>&nbsp;negotiate a contract with the winning firm at &#8220;a fair and reasonable fee.&#8221;<\/p>\n\n\n\n<p>The Uniform Guidance allows entities to solicit either (1) sealed bids or (2) proposals.&nbsp; But, regardless of which method the government entity chooses, the entity is&nbsp;<strong>required to use price to determine the winning bid<\/strong>. If the entity uses sealed bids, it must award the contract to the &#8220;responsible bidder whose bid . . . is the lowest in price.&#8221;&nbsp; If the entity solicits proposals, it must award the contract to the &#8220;the responsible offeror whose proposal is most advantageous to the non\u2013Federal entity, with price and other factors considered.&#8221; 2 C.F.R. \u00a7 200.320(b)(2)(iii).<\/p>\n\n\n\n<p>In North Carolina, however, the government has not been able to use price as a selection factor when procuring architectural or engineering services. &nbsp;For years, the government simply could not use the Uniform Guidance&#8217;s procedures to procure design-build services.&nbsp; The federal requirement that selection of design-build services be determined based on price, while North Carolina says that price cannot be a factor, means that the government&nbsp;<em><u>cannot<\/u><\/em>&nbsp;procure design-build services when using money subject to the Uniform Guidance.&nbsp; This complication was just something North Carolina procurement officials and their attorneys came to accept and live with.<\/p>\n\n\n\n<p>Then Congress appropriated an unprecedented amount of money for infrastructure during the coronavirus pandemic.&nbsp; And that money had to be spent relatively quickly.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>A Temporary Solution<\/strong><\/h3>\n\n\n\n<p>Massive federal dollars plus the need for speed made design-build especially attractive to the government.&nbsp; The tension between the Uniform Guidance and state law made many government attorneys and project managers reject the design-build procurement option.<\/p>\n\n\n\n<p>But, some said, &#8220;there must be a solution.&#8221;&nbsp; Perhaps Congress could change the Uniform Guidance to match North Carolina?&nbsp; That idea was simply too complicated and would take too long.&nbsp; The other option was more doable: Change the North Carolina General Statutes.&nbsp; And that&#8217;s what happened.<\/p>\n\n\n\n<p>To help rectify these inconsistencies, the North Carolina General Assembly enacted\u00a0<a href=\"https:\/\/www.ncleg.gov\/Sessions\/2021\/Bills\/House\/PDF\/H334v8.pdf#page=6\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Session Law 2021-189. \u00a0Section 5.17.(a)<\/a>\u00a0of that law removes the requirement that price cannot be a factor in selecting the winning bid.\u00a0 Under the session law, government entities now have the option to &#8220;select and commence contract negotiations with the design-builder whose response is ranked\u00a0<strong>most advantageous<\/strong>&#8221; to the government entity, the determination of which\u00a0<strong>can include price<\/strong>.<\/p>\n\n\n\n<p>While this certainly helps to bridge the gap between federal procurement laws and state design-build procurement laws, it is set to&nbsp;<strong>expire in December 2025<\/strong>. It remains to be seen how the legislature will address its expiration. However, the need to better align our state statutes with the Uniform Guidance is clearly, and rightfully, something contractors, government attorneys, and legislators should confront.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Conclusion: Stay Tuned<\/strong><\/h3>\n\n\n\n<p>In conclusion, federal dollars can benefit public construction projects.\u00a0 But government owners, engineers, architects, and contractors must watch out for the interplay between the Uniform Guidance and state law.\u00a0 The North Carolina General Assembly has temporarily allowed state law to match up with the Uniform Guidance for design-build procurement procedures.\u00a0 But when the special permission sunsets in 2025, we will be back to the pre-pandemic problem.\u00a0 Perhaps now is a good time for legislators to permanently bring North Carolina law into line with the Uniform Guidance.\u00a0<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong>When one of your cases is in need of a construction expert, estimates, insurance appraisal or umpire services in defect or insurance disputes &#8211; please call Advise &amp; Consult, Inc. at 888.684.8305, or email <a href=\"mailto:experts@adviseandconsult.net\" target=\"_blank\" rel=\"noreferrer noopener\">experts@adviseandconsult.net<\/a>.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Alexandra Ferri and James Norment | Ward and Smith North Carolina statutes permit State agencies and local governments (the &#8220;government&#8221;) to use alternatives to traditional bid-build approaches to construction.\u00a0 Two popular options are construction manager at risk and design-build delivery methods. \u00a0The\u00a0North Carolina General Statutes\u00a0set out the method the government must use in determining the&hellip; <a class=\"more-link\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/\">Continue reading <span class=\"screen-reader-text\">Federal Dollars are Nice to Get, but Owners, Designers, and Builders Need to Watch Out for Those Strings<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[14],"tags":[9895,11950],"class_list":["post-901569","post","type-post","status-publish","format-standard","hentry","category-construction-2","tag-advise-consult","tag-bid-build-construction","entry"],"jetpack_publicize_connections":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Federal Dollars are Nice to Get, but Owners, Designers, and Builders Need to Watch Out for Those Strings - Advise &amp; Consult, Inc.<\/title>\n<meta name=\"description\" content=\"North Carolina statutes permit State agencies and local governments to use alternatives to traditional bid-build approaches to construction\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Federal Dollars are Nice to Get, but Owners, Designers, and Builders Need to Watch Out for Those Strings - Advise &amp; Consult, Inc.\" \/>\n<meta property=\"og:description\" content=\"North Carolina statutes permit State agencies and local governments to use alternatives to traditional bid-build approaches to construction\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/\" \/>\n<meta property=\"og:site_name\" content=\"Advise &amp; Consult, Inc.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-05T21:20:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-09-05T21:20:41+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:site\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\"},\"headline\":\"Federal Dollars are Nice to Get, but Owners, Designers, and Builders Need to Watch Out for Those Strings\",\"datePublished\":\"2023-09-05T21:20:38+00:00\",\"dateModified\":\"2023-09-05T21:20:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/\"},\"wordCount\":1004,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"keywords\":[\"Advise &amp; Consult\",\"Bid-Build Construction\"],\"articleSection\":[\"Construction\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/\",\"name\":\"Federal Dollars are Nice to Get, but Owners, Designers, and Builders Need to Watch Out for Those Strings - Advise &amp; Consult, Inc.\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\"},\"datePublished\":\"2023-09-05T21:20:38+00:00\",\"dateModified\":\"2023-09-05T21:20:41+00:00\",\"description\":\"North Carolina statutes permit State agencies and local governments to use alternatives to traditional bid-build approaches to construction\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"name\":\"Advise &amp; Consult, Inc.\",\"description\":\"Construction Expert Witnesses\",\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\",\"name\":\"Advise & Consult\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"contentUrl\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"width\":162,\"height\":75,\"caption\":\"Advise & Consult\"},\"image\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\",\"https:\/\/x.com\/adviseconsult\",\"https:\/\/www.linkedin.com\/company-beta\/204526\/\",\"https:\/\/www.youtube.com\/user\/MrConstructionExpert\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/www.expertwitnessinconstruction.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Federal Dollars are Nice to Get, but Owners, Designers, and Builders Need to Watch Out for Those Strings - Advise &amp; Consult, Inc.","description":"North Carolina statutes permit State agencies and local governments to use alternatives to traditional bid-build approaches to construction","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/","og_locale":"en_US","og_type":"article","og_title":"Federal Dollars are Nice to Get, but Owners, Designers, and Builders Need to Watch Out for Those Strings - Advise &amp; Consult, Inc.","og_description":"North Carolina statutes permit State agencies and local governments to use alternatives to traditional bid-build approaches to construction","og_url":"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/","og_site_name":"Advise &amp; Consult, Inc.","article_publisher":"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","article_published_time":"2023-09-05T21:20:38+00:00","article_modified_time":"2023-09-05T21:20:41+00:00","author":"admin","twitter_card":"summary_large_image","twitter_creator":"@adviseconsult","twitter_site":"@adviseconsult","twitter_misc":{"Written by":"admin","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/#article","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/"},"author":{"name":"admin","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7"},"headline":"Federal Dollars are Nice to Get, but Owners, Designers, and Builders Need to Watch Out for Those Strings","datePublished":"2023-09-05T21:20:38+00:00","dateModified":"2023-09-05T21:20:41+00:00","mainEntityOfPage":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/"},"wordCount":1004,"commentCount":0,"publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"keywords":["Advise &amp; Consult","Bid-Build Construction"],"articleSection":["Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/","name":"Federal Dollars are Nice to Get, but Owners, Designers, and Builders Need to Watch Out for Those Strings - Advise &amp; Consult, Inc.","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website"},"datePublished":"2023-09-05T21:20:38+00:00","dateModified":"2023-09-05T21:20:41+00:00","description":"North Carolina statutes permit State agencies and local governments to use alternatives to traditional bid-build approaches to construction","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.myconstructionexpert.com\/blog\/bid-build-federal-dollars\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website","url":"https:\/\/www.myconstructionexpert.com\/blog\/","name":"Advise &amp; Consult, Inc.","description":"Construction Expert Witnesses","publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization","name":"Advise & Consult","url":"https:\/\/www.myconstructionexpert.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","contentUrl":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","width":162,"height":75,"caption":"Advise & Consult"},"image":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","https:\/\/x.com\/adviseconsult","https:\/\/www.linkedin.com\/company-beta\/204526\/","https:\/\/www.youtube.com\/user\/MrConstructionExpert"]},{"@type":"Person","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","caption":"admin"},"sameAs":["http:\/\/www.expertwitnessinconstruction.com"]}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2ztG6-3Mxr","jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/901569","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/comments?post=901569"}],"version-history":[{"count":1,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/901569\/revisions"}],"predecessor-version":[{"id":901570,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/901569\/revisions\/901570"}],"wp:attachment":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/media?parent=901569"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/categories?post=901569"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/tags?post=901569"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}