{"id":905392,"date":"2026-02-25T14:52:04","date_gmt":"2026-02-25T21:52:04","guid":{"rendered":"https:\/\/www.myconstructionexpert.com\/blog\/?p=905392"},"modified":"2026-02-25T14:52:06","modified_gmt":"2026-02-25T21:52:06","slug":"tariff-volatility-contract-drafting-procurement-strategies","status":"publish","type":"post","link":"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/","title":{"rendered":"Managing Tariff Volatility in Cross\u2011Border U.S. Construction Projects: Practical Contract\u2011Drafting and Procurement Strategies"},"content":{"rendered":"\n<p>Sara Beiro Farabow and Michael Wagner, Jr. | <a href=\"https:\/\/www.internationaldisputeresolutionlaw.com\/2026\/02\/managing-tariff-volatility-in-cross%e2%80%91border-u-s-construction-projects-practical-contract%e2%80%91drafting-and-procurement-strategies\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Seyfarth Shaw<\/a><\/p>\n\n\n\n<p>Volatile U.S. <a href=\"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-how-to-approach-potential-tariffs\/\">tariff<\/a> announcements continue to affect international supply chains for U.S. construction projects. Although recent litigation has centered on the scope of presidential tariff authority rather than construction\u2011specific disputes, these decisions carry important implications for how parties structure risk in their contracts. In May 2025, the U.S. Court of International Trade (CIT) struck down certain \u201cLiberation Day\u201d tariffs as exceeding presidential authority under IEEPA. A federal district court in Washington, D.C. likewise issued a preliminary injunction suspending related tariffs\u2014though it later stayed its own order pending appeal. And the Supreme Court has agreed to review cases addressing the legal limits of IEEPA\u2011based tariffs.<\/p>\n\n\n\n<p>While none of these developments arises from construction disputes, the themes they highlight\u2014<strong>timing, statutory authority, and documentation<\/strong>\u2014mirror the issues encountered when tariff conditions disrupt international procurement. The following strategies reflect practical steps U.S. project owners, contractors, and foreign suppliers can take to mitigate risk, drawing on drafting approaches now widely used across major construction forms, including\u2014but not limited to\u2014modified AIA agreements.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>1. Strengthen Contract Provisions to Manage Tariff\u2011Driven Cost Escalation<\/strong><\/h4>\n\n\n\n<p><strong>Clarify Escalation and Cost\u2011Sharing Models<\/strong><\/p>\n\n\n\n<p>Many construction contracts include&nbsp;<strong>capped risk\u2011sharing structures<\/strong>&nbsp;to address material cost volatility. Contractors typically absorb cost increases up to a negotiated threshold\u2014often 10\u201315%\u2014after which owners share or assume the excess, subject to notice and documentation requirements. This remains one of the most balanced approaches to addressing tariff unpredictability.<\/p>\n\n\n\n<p>Contracts also increasingly include&nbsp;<strong>pricing trigger ranges<\/strong>&nbsp;(commonly \u00b15\u201310%) requiring the parties to reassess pricing when material costs shift beyond agreed bands.<\/p>\n\n\n\n<p><strong>Use Precise, Timing\u2011Based Tariff Definitions<\/strong><\/p>\n\n\n\n<p>Construction contracts must also take into account tariff effective dates, specifying that tariff\u2011related relief applies only to tariffs&nbsp;<strong>enacted after<\/strong>&nbsp;the contract\u2019s effective date.<\/p>\n\n\n\n<p><strong>Balance Escalation With Savings Provisions<\/strong><\/p>\n\n\n\n<p>Because some tariffs have been suspended or stayed pending appeal, well\u2011drafted contracts\u00a0<a href=\"https:\/\/www.constructionseyt.com\/2025\/04\/allocating-the-risk-of-tariff-price-increases\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">now include<\/a>\u00a0<strong>savings provisions<\/strong>\u00a0requiring parties to share decreases in cost when tariff\u2011related prices fall. This symmetry promotes fairness and reduces disputes as markets stabilize.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>2. Refine Risk Allocation Across Interlocking Contract Clauses<\/strong><\/h4>\n\n\n\n<p>Tariff\u2011related risk is typically spread across multiple provisions\u2014not just escalation clauses.<\/p>\n\n\n\n<p><strong>Guaranteed Maximum Price (GMP) Contingency Language<\/strong><\/p>\n\n\n\n<p>On GMP projects, contractors often negotiate the right to use contingency funds for tariff\u2011related cost increases. Owners typically limit such use to non\u2011contractor\u2011caused events. Clear drafting reduces later disagreement over whether contingency use was appropriate.<\/p>\n\n\n\n<p><strong>Buyout and Price\u2011Hold Requirements<\/strong><\/p>\n\n\n\n<p>Volatile tariff timing has led some subcontractors to resist long price\u2011hold periods. Contracts should address how design development, delayed notices to proceed, or owner\u2011driven sequencing changes affect suppliers\u2019 pricing obligations.<\/p>\n\n\n\n<p><strong>Tailored Delay Provisions<\/strong><\/p>\n\n\n\n<p>Tariff\u2011driven procurement delays may be treated as&nbsp;<strong>excusable (but not necessarily compensable)<\/strong>. Expressly identifying tariff\u2011related disruptions as potential causes of excusable delay promotes clarity without overreliance on force\u2011majeure provisions\u2014which courts interpret narrowly.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>3. Mitigate Procurement Exposure Through Early Planning and Supplier Engagement<\/strong><\/h4>\n\n\n\n<p>International commentary notes that sudden tariff changes can significantly disrupt supply chains, especially in industries dependent on imported steel, aluminum, and specialty components. For construction projects with cross\u2011border material dependencies, the following steps can reduce exposure:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Early procurement or hedging<\/strong>\u00a0to secure pricing before tariff changes.<\/li>\n\n\n\n<li><strong>Alternative or parallel sourcing<\/strong>\u00a0to diversify suppliers in non\u2011impacted regions.<\/li>\n\n\n\n<li><strong>Structured supplier communication protocols<\/strong>\u00a0to ensure early notice of tariff developments.<\/li>\n\n\n\n<li><strong>Rolling procurement schedules<\/strong>\u00a0that help isolate tariff\u2011related impacts before full buyout.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>4. Strengthen Documentation and Notice Practices<\/strong><\/h4>\n\n\n\n<p>Tariff\u2011related litigation underscores the importance of detailed, contemporaneous records. Construction participants can adopt documentation discipline through:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Procurement records showing when quotes were obtained and how tariff timing affected pricing.<\/li>\n\n\n\n<li>Supplier correspondence linking cost or schedule impacts to specific tariff enactments.<\/li>\n\n\n\n<li>Documentation of mitigation efforts, including alternative sourcing and expedited procurement.<\/li>\n\n\n\n<li>Separate cost\u2011tracking for tariff\u2011driven impacts versus general market inflation.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>5. Incorporate Flexible Contractual Tools to Address Tariff Volatility<\/strong><\/h4>\n\n\n\n<p>While tariffs may trigger broader cross\u2011border commercial disputes, construction stakeholders can still manage volatility by proactively incorporating&nbsp;<strong>flexible and well\u2011structured contractual tools<\/strong>, such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Predefined cost\u2011sharing thresholds<\/strong>\u00a0tied to tariff\u2011driven cost increases.<\/li>\n\n\n\n<li><strong>Conditional pricing adjustments<\/strong>\u00a0triggered by new or rescinded tariff actions.<\/li>\n\n\n\n<li><strong>Re\u2011pricing or termination rights<\/strong>\u00a0in extreme circumstances.<\/li>\n\n\n\n<li><strong>Structured review procedures<\/strong>\u00a0to evaluate tariff impacts collaboratively.<\/li>\n<\/ul>\n\n\n\n<p>These tools help project participants respond to tariff changes constructively and maintain project momentum.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Conclusion<\/strong><\/h4>\n\n\n\n<p>As courts continue evaluating the legality of recent U.S. tariff actions, construction stakeholders can seek to mitigate the risk of the politically weaponized tariffs through&nbsp;<strong>carefully coordinated contract drafting<\/strong>,&nbsp;<strong>proactive procurement planning<\/strong>, and&nbsp;<strong>robust documentation<\/strong>. By updating contract provisions to address tariff timing, escalation, savings, contingencies, and procurement delays, owners, contractors, and suppliers can manage politically driven tariff volatility with greater confidence and stability.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong>When one of your cases is in need of a construction expert, estimates, insurance appraisal or umpire services in defect or insurance disputes &#8211; please call Advise &amp; Consult, Inc. at 888.684.8305, or email <a href=\"mailto:experts@adviseandconsult.net\">experts@adviseandconsult.net<\/a>.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sara Beiro Farabow and Michael Wagner, Jr. | Seyfarth Shaw Volatile U.S. tariff announcements continue to affect international supply chains for U.S. construction projects. Although recent litigation has centered on the scope of presidential tariff authority rather than construction\u2011specific disputes, these decisions carry important implications for how parties structure risk in their contracts. In May&hellip; <a class=\"more-link\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/\">Continue reading <span class=\"screen-reader-text\">Managing Tariff Volatility in Cross\u2011Border U.S. Construction Projects: Practical Contract\u2011Drafting and Procurement Strategies<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[14,9],"tags":[9895,11274,12,224,12138],"class_list":["post-905392","post","type-post","status-publish","format-standard","hentry","category-construction-2","category-construction-contracts","tag-advise-consult","tag-aia-contract","tag-construction","tag-construction-contract","tag-tariffs","entry"],"jetpack_publicize_connections":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Managing Tariff Volatility in Cross\u2011Border U.S. Construction Projects: Practical Contract\u2011Drafting and Procurement Strategies - Advise &amp; Consult, Inc.<\/title>\n<meta name=\"description\" content=\"following strategies reflect practical steps U.S. project owners, contractors, and foreign suppliers can take to mitigate risk with tariffs\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Managing Tariff Volatility in Cross\u2011Border U.S. Construction Projects: Practical Contract\u2011Drafting and Procurement Strategies - Advise &amp; Consult, Inc.\" \/>\n<meta property=\"og:description\" content=\"following strategies reflect practical steps U.S. project owners, contractors, and foreign suppliers can take to mitigate risk with tariffs\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/\" \/>\n<meta property=\"og:site_name\" content=\"Advise &amp; Consult, Inc.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-25T21:52:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-25T21:52:06+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:site\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\"},\"headline\":\"Managing Tariff Volatility in Cross\u2011Border U.S. Construction Projects: Practical Contract\u2011Drafting and Procurement Strategies\",\"datePublished\":\"2026-02-25T21:52:04+00:00\",\"dateModified\":\"2026-02-25T21:52:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/\"},\"wordCount\":857,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"keywords\":[\"Advise &amp; Consult\",\"AIA Contract\",\"construction\",\"Construction Contract\",\"Tariffs\"],\"articleSection\":[\"Construction\",\"Construction Contracts\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/\",\"name\":\"Managing Tariff Volatility in Cross\u2011Border U.S. Construction Projects: Practical Contract\u2011Drafting and Procurement Strategies - Advise &amp; Consult, Inc.\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\"},\"datePublished\":\"2026-02-25T21:52:04+00:00\",\"dateModified\":\"2026-02-25T21:52:06+00:00\",\"description\":\"following strategies reflect practical steps U.S. project owners, contractors, and foreign suppliers can take to mitigate risk with tariffs\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"name\":\"Advise &amp; Consult, Inc.\",\"description\":\"Construction Expert Witnesses\",\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\",\"name\":\"Advise & Consult\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"contentUrl\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"width\":162,\"height\":75,\"caption\":\"Advise & Consult\"},\"image\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\",\"https:\/\/x.com\/adviseconsult\",\"https:\/\/www.linkedin.com\/company-beta\/204526\/\",\"https:\/\/www.youtube.com\/user\/MrConstructionExpert\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/www.expertwitnessinconstruction.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Managing Tariff Volatility in Cross\u2011Border U.S. Construction Projects: Practical Contract\u2011Drafting and Procurement Strategies - Advise &amp; Consult, Inc.","description":"following strategies reflect practical steps U.S. project owners, contractors, and foreign suppliers can take to mitigate risk with tariffs","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/","og_locale":"en_US","og_type":"article","og_title":"Managing Tariff Volatility in Cross\u2011Border U.S. Construction Projects: Practical Contract\u2011Drafting and Procurement Strategies - Advise &amp; Consult, Inc.","og_description":"following strategies reflect practical steps U.S. project owners, contractors, and foreign suppliers can take to mitigate risk with tariffs","og_url":"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/","og_site_name":"Advise &amp; Consult, Inc.","article_publisher":"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","article_published_time":"2026-02-25T21:52:04+00:00","article_modified_time":"2026-02-25T21:52:06+00:00","author":"admin","twitter_card":"summary_large_image","twitter_creator":"@adviseconsult","twitter_site":"@adviseconsult","twitter_misc":{"Written by":"admin","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/#article","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/"},"author":{"name":"admin","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7"},"headline":"Managing Tariff Volatility in Cross\u2011Border U.S. Construction Projects: Practical Contract\u2011Drafting and Procurement Strategies","datePublished":"2026-02-25T21:52:04+00:00","dateModified":"2026-02-25T21:52:06+00:00","mainEntityOfPage":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/"},"wordCount":857,"commentCount":0,"publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"keywords":["Advise &amp; Consult","AIA Contract","construction","Construction Contract","Tariffs"],"articleSection":["Construction","Construction Contracts"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/","name":"Managing Tariff Volatility in Cross\u2011Border U.S. Construction Projects: Practical Contract\u2011Drafting and Procurement Strategies - Advise &amp; Consult, Inc.","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website"},"datePublished":"2026-02-25T21:52:04+00:00","dateModified":"2026-02-25T21:52:06+00:00","description":"following strategies reflect practical steps U.S. project owners, contractors, and foreign suppliers can take to mitigate risk with tariffs","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.myconstructionexpert.com\/blog\/tariff-volatility-contract-drafting-procurement-strategies\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website","url":"https:\/\/www.myconstructionexpert.com\/blog\/","name":"Advise &amp; Consult, Inc.","description":"Construction Expert Witnesses","publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization","name":"Advise & Consult","url":"https:\/\/www.myconstructionexpert.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","contentUrl":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","width":162,"height":75,"caption":"Advise & Consult"},"image":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","https:\/\/x.com\/adviseconsult","https:\/\/www.linkedin.com\/company-beta\/204526\/","https:\/\/www.youtube.com\/user\/MrConstructionExpert"]},{"@type":"Person","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","caption":"admin"},"sameAs":["http:\/\/www.expertwitnessinconstruction.com"]}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2ztG6-3Nx6","jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/905392","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/comments?post=905392"}],"version-history":[{"count":1,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/905392\/revisions"}],"predecessor-version":[{"id":905393,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/905392\/revisions\/905393"}],"wp:attachment":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/media?parent=905392"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/categories?post=905392"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/tags?post=905392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}