{"id":905568,"date":"2026-04-15T15:33:09","date_gmt":"2026-04-15T21:33:09","guid":{"rendered":"https:\/\/www.myconstructionexpert.com\/blog\/?p=905568"},"modified":"2026-04-15T15:33:13","modified_gmt":"2026-04-15T21:33:13","slug":"construction-contract-negotiation-and-drafting-practical-checklist","status":"publish","type":"post","link":"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/","title":{"rendered":"Construction Contract\u00a0Negotiation\u00a0&amp; Drafting: A Practical Checklist (and Where State-Specific Issues Can Surprise You)"},"content":{"rendered":"\n<p>Michelle Cooper | <a href=\"https:\/\/www.sheppard.com\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Sheppard<\/a><\/p>\n\n\n\n<p>Construction contract negotiation is often treated as a \u201cforms exercise,\u201d especially when the parties start from familiar templates (e.g., AIA forms). In practice, though, the biggest problems tend to arise not from the existence of a form, but from (i) misalignment among the project\u2019s governing documents and participants, (ii) ambiguity in pricing and payment mechanics, and (iii) state-specific statutory requirements that override negotiated terms.<\/p>\n\n\n\n<p>This article includes a practical checklist intended to help owners, developers, and contractors streamline <a href=\"https:\/\/www.myconstructionexpert.com\/blog\/catching-killer-clauses-in-contract-negotiations\/\">contract negotiations<\/a>, reduce downstream disputes, and avoid unpleasant surprises during payment administration.<\/p>\n\n\n\n<p><strong>1. Start by identifying \u201cother agreements\u201d that drive contract terms<\/strong><\/p>\n\n\n\n<p>Before drafting or revising the construction agreement, confirm what other project documents exist and which ones must be incorporated, flowed down, or simply understood for context. Common examples include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Lease requirements<\/strong>\u00a0(tenant improvement projects often have tight constraints and approval processes)<\/li>\n\n\n\n<li><strong>Lender requirements<\/strong>\u00a0(payment processes, lien waiver forms, audit rights, and conditions precedent)<\/li>\n\n\n\n<li><strong>Public-entity requirements<\/strong>\u00a0(even on quasi-private projects, certain public funding or agency conditions may apply)<\/li>\n<\/ul>\n\n\n\n<p>A recurring issue is negotiating contract language that assumes certain review\/approval timing or payment processes, only to find later that the lease, loan documents, or agency requirements make those timelines unrealistic (or impossible).<\/p>\n\n\n\n<p><strong>2. Initial client intake: confirm project basics that determine the contract structure<\/strong><\/p>\n\n\n\n<p>Early intake questions should be treated as issue-spotting, not \u201cbackground.\u201d<\/p>\n\n\n\n<p>Key items to confirm include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Contract price<\/strong>\u00a0and overall project scale<\/li>\n\n\n\n<li><strong>Public vs. private<\/strong>\u00a0(this drives many statutory requirements and risk allocations)<\/li>\n\n\n\n<li><strong>Project type and known risk points<\/strong>\u00a0(e.g., demolition in a condo vs. standalone site work)<\/li>\n\n\n\n<li><strong>Delivery model:<\/strong>\u00a0lump sum vs. cost-plus (and whether a GMP is expected)<\/li>\n<\/ul>\n\n\n\n<p>For<strong>&nbsp;cost-plus&nbsp;<\/strong>arrangements in particular, counsel should push for clarity on how the parties define and categorize \u201ccosts,\u201d because clients often assume the contractor\u2019s internal accounting definitions match the owner\u2019s expectations- until the first requisitions arrive.<\/p>\n\n\n\n<p><strong>3. Cost-plus \u201cgotchas\u201d: define costs, fees, and markups with precision<\/strong><\/p>\n\n\n\n<p>If the project uses cost-plus pricing (with or without a GMP), confirm the contract clearly addresses:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>What constitutes\u00a0<strong>Cost of the Work vs. General Conditions<\/strong><\/li>\n\n\n\n<li>Whether General Conditions are<strong>\u00a0lump sum or itemized<\/strong><\/li>\n\n\n\n<li><strong>Change order pricing<\/strong>\u00a0(fees\/markups applied to changes, including owner-driven changes)<\/li>\n\n\n\n<li><strong>Insurance charges<\/strong>\u00a0and how they are calculated (e.g., percentage of what baseline?)<\/li>\n\n\n\n<li>What \u201cjobsite\u201d vs. \u201chome office\u201d costs are permissible (and how they are substantiated)<\/li>\n<\/ul>\n\n\n\n<p>It is not uncommon to see owners surprised by categories permitted in standard-form definitions (including certain paid time off practices) or by attempted pass-throughs of costs that feel unrelated to the project. The best time to address these issues is before execution, by aligning expectations and tightening definitions.<\/p>\n\n\n\n<p><strong>4. Allowances, contingency, and the approval mechanism should be negotiated, not assumed<\/strong><\/p>\n\n\n\n<p>Allowances and contingency are often treated as \u201cbusiness points,\u201d but they create legal disputes when:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the triggering conditions are unclear,<\/li>\n\n\n\n<li>the approval mechanism is vague, or<\/li>\n\n\n\n<li>budgets circulate without a binding amendment.<\/li>\n<\/ul>\n\n\n\n<p>If a&nbsp;<strong>GMP&nbsp;<\/strong>will be established later by amendment, treat that amendment as a critical path item. A common failure mode is an extended exchange of budgets and revisions without a final executed GMP amendment, leaving the parties to litigate what they \u201cmeant\u201d rather than what they signed.<\/p>\n\n\n\n<p><strong>5. Early work, letters of intent, and long-lead procurement: avoid accidental over-commitment<\/strong><\/p>\n\n\n\n<p>Many projects require<strong>&nbsp;early release work<\/strong>&nbsp;(e.g., demolition, mobilization, enabling work) or early procurement of&nbsp;<strong>long-lead items<\/strong>&nbsp;(fabricated steel, major equipment, specialty systems). When that happens, the key is to structure early authorizations so they are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>sufficiently\u00a0<strong>binding\u00a0<\/strong>to allow work to proceed, but<\/li>\n\n\n\n<li>narrow enough to avoid locking the owner into the full contract risk allocation before the main agreement is negotiated.<\/li>\n<\/ul>\n\n\n\n<p>For long-lead items, it may be worth discussing whether procurement should be segregated and later&nbsp;<strong>assigned&nbsp;<\/strong>to the GC\/CM, depending on schedule risk and negotiation posture.<\/p>\n\n\n\n<p><strong>6. Define project participants and their roles (and align them across contracts)<\/strong><\/p>\n\n\n\n<p>Projects frequently include multiple \u201cdecision-makers\u201d in practice, like architects, owner\u2019s reps, consultants, construction managers, whose actual roles may differ from the paper contract. Counsel should confirm and document:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Who reviews\u00a0<strong>submittals\u00a0<\/strong>and within what time<\/li>\n\n\n\n<li>Who reviews\u00a0<strong>payment applications<\/strong>\u00a0and certifies amounts due<\/li>\n\n\n\n<li>Who serves as the\u00a0<strong>initial decision-maker<\/strong>\u00a0for disputes (if any)<\/li>\n\n\n\n<li>Who certifies\u00a0<strong>substantial\u00a0<\/strong>and\u00a0<strong>final completion<\/strong><\/li>\n<\/ul>\n\n\n\n<p>This is particularly important when using standard AIA language that assigns significant authority to the architect. Some owners may not want architect determinations (e.g., payment certification, completion) to become de facto binding decision points, especially if a consultant is actually performing those functions.<\/p>\n\n\n\n<p><strong>7. Delay and damages: avoid internal contradictions in the remedy scheme<\/strong><\/p>\n\n\n\n<p>Owners and contractors should evaluate early on how the contract addresses delay-related exposure. One common tension is pairing:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>liquidated damages<\/strong>, and<\/li>\n\n\n\n<li>a broad\u00a0<strong>mutual waiver of consequential damages.<\/strong><\/li>\n<\/ul>\n\n\n\n<p>Whether that combination makes sense is often a business decision, but it should be deliberate. The remedy structure should be coherent and match the project\u2019s risk profile (and the client\u2019s leverage).<\/p>\n\n\n\n<p><strong>8. State-specific rules: build them into the checklist, not the post-signature scramble<\/strong><\/p>\n\n\n\n<p>Even with standardized templates, construction contracts are heavily shaped by jurisdiction-specific statutes and public policy limitations. Items that frequently require state-by-state review include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Retainage limits<\/strong>\u00a0(recent statutory changes have tightened caps in multiple states)<\/li>\n\n\n\n<li><strong>Prompt payment\u00a0<\/strong>timeframes (including \u201cdeemed approved\u201d regimes and notice requirements)<\/li>\n\n\n\n<li><strong>Lien waiver form requirements<\/strong>\u00a0(some states mandate statutory forms)<\/li>\n\n\n\n<li><strong>Anti-indemnity statutes<\/strong>\u00a0and how they affect enforceability<\/li>\n\n\n\n<li>Limits on\u00a0<strong>waiving lien rights<\/strong><\/li>\n\n\n\n<li>Whether\u00a0<strong>no-damage-for-delay<\/strong>\u00a0is enforceable and what exceptions apply<\/li>\n\n\n\n<li>Enforceability of\u00a0<strong>pay-when-paid\/paid-if-paid<\/strong><\/li>\n\n\n\n<li>Trust-fund style regimes (e.g., protections for downstream participants)<\/li>\n<\/ul>\n\n\n\n<p>Because these rules change, it is worth confirming them even when the deal seems routine.<\/p>\n\n\n\n<p><strong>9. Indemnification: focus on the state-specific \u201cfault line\u201d issues<\/strong><\/p>\n\n\n\n<p>Indemnity provisions are a high-risk area for jurisdictional variation. Common issues to analyze include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>whether the state distinguishes a\u00a0<strong>duty to defend\u00a0<\/strong>from a duty to indemnify,<\/li>\n\n\n\n<li>whether defense obligations can be triggered\u00a0<strong>immediately upon tender<\/strong>\u00a0(as they may be in some jurisdictions),<\/li>\n\n\n\n<li>statutory limits on indemnifying a party for its own negligence (and how the statute is framed), and<\/li>\n\n\n\n<li>whether violating the anti-indemnity statute risks invalidating the indemnity clause in whole (not merely trimming it).<\/li>\n<\/ul>\n\n\n\n<p>As a drafting matter, it is often critical to include \u201cto the fullest extent permitted by law\u201d savings language and to ensure carve-outs match the jurisdiction\u2019s statutory language.<\/p>\n\n\n\n<p><strong>10. Prompt payment: comply, preserve leverage, and don\u2019t \u201cshortchange\u201d the owner<\/strong><\/p>\n\n\n\n<p>Prompt payment statutes commonly regulate:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the time to\u00a0<strong>approve\/reject\u00a0<\/strong>a payment application (and what constitutes a valid rejection),<\/li>\n\n\n\n<li>the time to pay\u00a0<strong>undisputed amounts<\/strong>, and<\/li>\n\n\n\n<li>the\u00a0<strong>interest rate<\/strong>\u00a0(and sometimes attorneys\u2019 fees) for late payment.<\/li>\n<\/ul>\n\n\n\n<p>From an owner perspective, the goal is to (i) comply with statutory deadlines, while also (ii) preserving sufficient review time and maintaining clean written notice procedures for disputed amounts.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong>When one of your cases is in need of a construction expert, estimates, insurance appraisal or umpire services in defect or insurance disputes &#8211; please call Advise &amp; Consult, Inc. at 801.641.8304, or email <a href=\"mailto:experts@adviseandconsult.net\">experts@adviseandconsult.net<\/a>.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Michelle Cooper | Sheppard Construction contract negotiation is often treated as a \u201cforms exercise,\u201d especially when the parties start from familiar templates (e.g., AIA forms). In practice, though, the biggest problems tend to arise not from the existence of a form, but from (i) misalignment among the project\u2019s governing documents and participants, (ii) ambiguity in&hellip; <a class=\"more-link\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/\">Continue reading <span class=\"screen-reader-text\">Construction Contract\u00a0Negotiation\u00a0&amp; Drafting: A Practical Checklist (and Where State-Specific Issues Can Surprise You)<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[9],"tags":[9895,224],"class_list":["post-905568","post","type-post","status-publish","format-standard","hentry","category-construction-contracts","tag-advise-consult","tag-construction-contract","entry"],"jetpack_publicize_connections":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Construction Contract\u00a0Negotiation\u00a0&amp; Drafting: A Practical Checklist (and Where State-Specific Issues Can Surprise You) - Advise &amp; Consult, Inc.<\/title>\n<meta name=\"description\" content=\"article includes a practical checklist intended to help owners, developers, and contractors streamline construction contract negotiations\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Contract\u00a0Negotiation\u00a0&amp; Drafting: A Practical Checklist (and Where State-Specific Issues Can Surprise You) - Advise &amp; Consult, Inc.\" \/>\n<meta property=\"og:description\" content=\"article includes a practical checklist intended to help owners, developers, and contractors streamline construction contract negotiations\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/\" \/>\n<meta property=\"og:site_name\" content=\"Advise &amp; Consult, Inc.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-15T21:33:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-15T21:33:13+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:site\" content=\"@adviseconsult\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\"},\"headline\":\"Construction Contract\u00a0Negotiation\u00a0&amp; Drafting: A Practical Checklist (and Where State-Specific Issues Can Surprise You)\",\"datePublished\":\"2026-04-15T21:33:09+00:00\",\"dateModified\":\"2026-04-15T21:33:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/\"},\"wordCount\":1182,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"keywords\":[\"Advise &amp; Consult\",\"Construction Contract\"],\"articleSection\":[\"Construction Contracts\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/\",\"name\":\"Construction Contract\u00a0Negotiation\u00a0&amp; Drafting: A Practical Checklist (and Where State-Specific Issues Can Surprise You) - Advise &amp; Consult, Inc.\",\"isPartOf\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\"},\"datePublished\":\"2026-04-15T21:33:09+00:00\",\"dateModified\":\"2026-04-15T21:33:13+00:00\",\"description\":\"article includes a practical checklist intended to help owners, developers, and contractors streamline construction contract negotiations\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#website\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"name\":\"Advise &amp; Consult, Inc.\",\"description\":\"Construction Expert Witnesses\",\"publisher\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#organization\",\"name\":\"Advise & Consult\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"contentUrl\":\"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png\",\"width\":162,\"height\":75,\"caption\":\"Advise & Consult\"},\"image\":{\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/\",\"https:\/\/x.com\/adviseconsult\",\"https:\/\/www.linkedin.com\/company-beta\/204526\/\",\"https:\/\/www.youtube.com\/user\/MrConstructionExpert\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/www.expertwitnessinconstruction.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Contract\u00a0Negotiation\u00a0&amp; Drafting: A Practical Checklist (and Where State-Specific Issues Can Surprise You) - Advise &amp; Consult, Inc.","description":"article includes a practical checklist intended to help owners, developers, and contractors streamline construction contract negotiations","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/","og_locale":"en_US","og_type":"article","og_title":"Construction Contract\u00a0Negotiation\u00a0&amp; Drafting: A Practical Checklist (and Where State-Specific Issues Can Surprise You) - Advise &amp; Consult, Inc.","og_description":"article includes a practical checklist intended to help owners, developers, and contractors streamline construction contract negotiations","og_url":"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/","og_site_name":"Advise &amp; Consult, Inc.","article_publisher":"https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","article_published_time":"2026-04-15T21:33:09+00:00","article_modified_time":"2026-04-15T21:33:13+00:00","author":"admin","twitter_card":"summary_large_image","twitter_creator":"@adviseconsult","twitter_site":"@adviseconsult","twitter_misc":{"Written by":"admin","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/#article","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/"},"author":{"name":"admin","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7"},"headline":"Construction Contract\u00a0Negotiation\u00a0&amp; Drafting: A Practical Checklist (and Where State-Specific Issues Can Surprise You)","datePublished":"2026-04-15T21:33:09+00:00","dateModified":"2026-04-15T21:33:13+00:00","mainEntityOfPage":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/"},"wordCount":1182,"commentCount":0,"publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"keywords":["Advise &amp; Consult","Construction Contract"],"articleSection":["Construction Contracts"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/","name":"Construction Contract\u00a0Negotiation\u00a0&amp; Drafting: A Practical Checklist (and Where State-Specific Issues Can Surprise You) - Advise &amp; Consult, Inc.","isPartOf":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website"},"datePublished":"2026-04-15T21:33:09+00:00","dateModified":"2026-04-15T21:33:13+00:00","description":"article includes a practical checklist intended to help owners, developers, and contractors streamline construction contract negotiations","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.myconstructionexpert.com\/blog\/construction-contract-negotiation-and-drafting-practical-checklist\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#website","url":"https:\/\/www.myconstructionexpert.com\/blog\/","name":"Advise &amp; Consult, Inc.","description":"Construction Expert Witnesses","publisher":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.myconstructionexpert.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#organization","name":"Advise & Consult","url":"https:\/\/www.myconstructionexpert.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","contentUrl":"https:\/\/www.myconstructionexpert.com\/blog\/wp-content\/uploads\/2015\/11\/AC-Red-Logo.png","width":162,"height":75,"caption":"Advise & Consult"},"image":{"@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Advise-Consult-Inc-126949043996790\/","https:\/\/x.com\/adviseconsult","https:\/\/www.linkedin.com\/company-beta\/204526\/","https:\/\/www.youtube.com\/user\/MrConstructionExpert"]},{"@type":"Person","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/0a11abe008083d5fb19c2b0feefe7bd7","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.myconstructionexpert.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b01e71b7acadd7657af782b7ad1a30cc?s=96&d=mm&r=pg","caption":"admin"},"sameAs":["http:\/\/www.expertwitnessinconstruction.com"]}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2ztG6-3NzW","jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/905568","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/comments?post=905568"}],"version-history":[{"count":1,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/905568\/revisions"}],"predecessor-version":[{"id":905569,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/posts\/905568\/revisions\/905569"}],"wp:attachment":[{"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/media?parent=905568"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/categories?post=905568"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.myconstructionexpert.com\/blog\/wp-json\/wp\/v2\/tags?post=905568"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}